Residential Building Projects: Building Cost Indicators and Drivers
7 references·1 citing·30 second hop
Residential Building Projects: Building Cost Indicators and Drivers (2007)Residential Building Projects: Building C…Time–Cost Relationships in Australian Building Construction Projects (2005)Time–Cost Relationships in Au…Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression (2003)Predicting Cost Deviation in …Forecast models for actual construction time and cost (2003)Forecast models for actual co…Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Influence of Project Type and…Data modelling and the application of a neural network approach to the prediction of total construction costs (2002)Data modelling and the applic…Quantity Surveying Techniques: New Directions (1990)Quantity Surveying Techniques…Developments in contract price forecasting and bidding techniques (1990)Developments in contract pric…Predicting likelihood of cost overrun in educational projects (2017)Predicting likelihood of cost…The Survey Research Handbook. (1986)The survey research handbook (1990)Questionnaire Design, Interviewing and Attitude Measurement (1993)Time‐cost model for building projects in Nigeria (2006)Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research (2015)Identifying the key process factors affecting project performance (2016)An investigation into construction time performance (1995)Rethinking construction cost overruns: cognition, learning and estimation (2014)Cost overruns of public sector construction projects: a developing country perspective (2019)Critical Success Factors for Construction Projects (1992)Gross Domestic Product (1994)Project cost estimation using principal component regression (2005)A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects (2010)Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts (2010)Quantifying the causes and costs of rework in construction (2000)A seamless supply chain management model for construction (2004)Taxonomy for change causes and effects in construction projects (2008)Measuring the Impact of Rework on Construction Cost Performance (2009)Determining Sample Size for Research Activities (1970)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)What Causes Cost Overrun in Transport Infrastructure Projects? (2004)Monte Carlo simulation of construction costs using subjective data (1995)Participatory Action Research Approach to Public Sector Procurement Selection (2011)Factors governing construction project delivery selection: A content analysis (2015)Interpersonal communication in cost planning during the building design phase (1996)The maturing concept of estimating project cost contingency: A review (2006)Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis (2021)Early Stage Cost Estimation of Buildings Construction Projects using Artificial Neural Networks (2010)Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects (2015)An artificial neural network approach for cost estimation of engineering services (2019)
this work references cited by second hop

References

  • 2002Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects464 cited
  • 2002Data modelling and the application of a neural network approach to the prediction of total construction costs148 cited
  • 2003Forecast models for actual construction time and cost146 cited
  • 2003Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression142 cited
  • 2005Time–Cost Relationships in Australian Building Construction Projects136 cited
  • 1990Quantity Surveying Techniques: New Directions70 cited
  • 1990Developments in contract price forecasting and bidding techniques42 cited

Cited by

  • 2017Predicting likelihood of cost overrun in educational projects29 cited