SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Work Continuity Constraints in Project Scheduling
16 references·16 citing·32 second hopsampled
Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints in Project Sc…RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)RanGen: A Random Network Gene…On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (2001)On Maximizing the Net Present…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…New Generation of Planning Structures (1993)New Generation of Planning St…Construction Project Scheduling (1991)Construction Project Scheduli…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Application of Linear Scheduling (1986)Application of Linear Schedul…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …Construction Planning for Linear Projects (1980)Construction Planning for Lin…Professional Construction Management (1976)Professional Construction Man…The payment scheduling problem (1972)The payment scheduling problemLinear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units (2021)Linear Optimization Model to …Enhanced Repetitive-Scheduling Computation and Visualization (2020)Enhanced Repetitive-Schedulin…Resource-constrained project scheduling with activity splitting and setup times (2019)Resource-constrained project …MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM (2019)MULTI-OBJECTIVE SYMBIOTIC ORG…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Optimised scheduling for weather sensitive offshore construction projects (2016)Optimised scheduling for weat…Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building (2011)Simulation-Based Schedule Est…Heracles or Sisyfus? Finding, Cleaning and Reconstructing a Database of Russian Banks (2010)Heracles or Sisyfus? Finding,…Resource-constrained scheduling for continuous repetitive projects with time-based production units (2009)Resource-constrained scheduli…Float Types in Linear Schedule Analysis with Singularity Functions (2009)Float Types in Linear Schedul…Automated trade‐off between time and cost in planning repetitive construction projects (2009)Automated trade‐off between t…Modeling Logistics Costs using Time-Driven ABC: A Case in a Distribution Company (2005)Modeling Logistics Costs usin…Measuring User Beliefs and Attitudes towards Conceptual Models: A Factor and Structural Equation Model (2005)Measuring User Beliefs and At…How do Early Stage High Technology Investors Select Their Investments (2005)How do Early Stage High Techn…Dynamic cross-sales effects of price promotions: Empirical generalizations (2004)Dynamic cross-sales effects o…Precedence and Arrow Networking Techniques for Construction (1980)Comparison of Delay Analysis Methodologies (1998)Simplified Program Evaluation and Review Technique (PERT) (1999)Evolutionary resource scheduler for linear projects (2007)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The use of buffers in project management: The trade-off between stability and makespan (2004)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)An evaluation of the adequacy of project network generators with systematically sampled networks (2007)Activity networks: Project planning and control by network models (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A Constraint-Based Method for Project Scheduling with Time Windows (2002)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Project selection, scheduling and resource allocation with time dependent returns (2007)Operational Research: methods and applications (2023)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Line‐of‐Balance Scheduling in Pavement Construction (1986)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Choosing Appropriate Construction Contracting Method (1994)Risk and its management in the Kuwaiti construction industry: a contractors’ perspective (2001)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1976Professional Construction Management314 cited
  • 1998Scheduling Projects with Repeating Activities309 cited
  • 2003RanGen: A Random Network Generator for Activity-on-the-Node Networks298 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1991Construction Project Scheduling149 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 2001On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints132 cited
  • 1986Application of Linear Scheduling128 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 1972The payment scheduling problem119 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993New Generation of Planning Structures

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

113 cited

Cited by

  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited
  • 2016Optimised scheduling for weather sensitive offshore construction projects58 cited
  • 2009Automated trade‐off between time and cost in planning repetitive construction projects52 cited
  • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
  • 2005Modeling Logistics Costs using Time-Driven ABC: A Case in a Distribution Company42 cited
  • 2020Enhanced Repetitive-Scheduling Computation and Visualization40 cited
  • 2009Resource-constrained scheduling for continuous repetitive projects with time-based production units38 cited
  • 2011Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building37 cited
  • 2019MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM37 cited
  • 2021Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units37 cited
  • 2019Resource-constrained project scheduling with activity splitting and setup times36 cited
  • 2009Float Types in Linear Schedule Analysis with Singularity Functions35 cited
  • 2005How do Early Stage High Technology Investors Select Their Investments26 cited
  • 2010Heracles or Sisyfus? Finding, Cleaning and Reconstructing a Database of Russian Banks26 cited
  • 2005Measuring User Beliefs and Attitudes towards Conceptual Models: A Factor and Structural Equation Model21 cited
  • 2004Dynamic cross-sales effects of price promotions: Empirical generalizations18 cited