SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost
16 references·2 citing·32 second hop
Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost (2009)Fuzzy multi-objective optimization of fin…Resource-constrained construction project scheduling model for profit maximization considering cash flow (2008)Resource-constrained construc…Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front (2005)Stochastic Time–Cost Optimiza…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Applying Pareto Ranking and N…Fuzzy membership functions of procurement selection criteria (2002)Fuzzy membership functions of…A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal mode…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Project-Network Analysis Using Fuzzy Sets Theory (1996)Project-Network Analysis Usin…Fuzzy sets (1996)Fuzzy setsCompany-Level Cash-Flow Management (1996)Company-Level Cash-Flow Manag…Fuzzy Multiple Attribute Decision Making (1992)Fuzzy Multiple Attribute Deci…Multiple Attribute Decision Making: Methods and Applications (1981)Multiple Attribute Decision M…Construction performance control by networks (1976)Construction performance cont…Fuzzy sets (1965)Fuzzy setsImpacts of uncertain project duration and asymmetric risk sensitivity information in project management (2015)Impacts of uncertain project …Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Multiobjective evolutionary f…Principles of accounting (1919)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project management in construction (2007)Metaheuristics for project and construction management – A state-of-the-art review (2011)A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)Intuitionistic Fuzzy Aggregation Operators (2007)A state-of the-art survey of TOPSIS applications (2012)Selection and application of risk management tools and techniques for build‐operate‐transfer projects (2004)Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness (2010)Project cash flow analysis in the presence of uncertainty in activity duration and cost (2011)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Bid/no-bid decision-making – a fuzzy linguistic approach (2004)Overview of the Application of “Fuzzy Techniques” in Construction Management Research (2009)Six decades of project management research: Thematic trends and future opportunities (2016)Extensions of the TOPSIS for group decision-making under fuzzy environment (2000)An approach for detecting, quantifying, and visualizing the evolution of a research field: A practical application to the Fuzzy Sets Theory field (2010)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)TOPSIS for MODM (1994)Tentative guidelines to help choosing an appropriate MCDA method (1998)Developing a fuzzy TOPSIS approach based on subjective weights and objective weights (2008)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)
this work references cited by second hop

References

  • 1965Fuzzy sets67,827 cited
  • 1996Fuzzy sets46,880 cited
  • 1981Multiple Attribute Decision Making: Methods and Applications8,206 cited
  • 1992Fuzzy Multiple Attribute Decision Making1,898 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2001A GA-based fuzzy optimal model for construction time–cost trade-off182 cited
  • 1996Project-Network Analysis Using Fuzzy Sets Theory156 cited
  • 2004Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization141 cited
  • 2008Resource-constrained construction project scheduling model for profit maximization considering cash flow123 cited
  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 2005Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front96 cited
  • 1976Construction performance control by networks94 cited
  • 2002Fuzzy membership functions of procurement selection criteria

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

83 cited
  • 1996Company-Level Cash-Flow Management75 cited
  • Cited by

    • 2015Impacts of uncertain project duration and asymmetric risk sensitivity information in project management40 cited
    • 2011Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio40 cited