SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Critical Path Segments Scheduling Technique
3 references·2 citing·17 second hop
Critical Path Segments Scheduling Technique (2010)Critical Path Segments Scheduling Techniq…Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects (2006)Survey of the Construction In…Project Management in Construction: Software Use and Research Directions (2001)Project Management in Constru…CPM in construction management (1971)CPM in construction managementImproving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Improving workflow and resour…Investigating the effect of construction management strategies on project greenhouse gas emissions using interactive simulation (2013)Investigating the effect of c…Understanding the key risks in construction projects in China (2007)A fuzzy approach to construction project risk assessment (2010)Risk assessment of construction projects (2010)Marketing research in a marketing environment (1990)A survey on the resource-constrained project scheduling problem (1995)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Implementing information systems with project teams using ethnographic–action research (2008)Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization (2008)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Case Study Research: Design and Methods (1984)Qualitative evaluation and research methods (1990)Case Study Research: Design and Methods (1991)Finding multiple possible critical paths using fuzzy PERT (2001)Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Using structural equation modeling to analyze relationships among key causes of delay in construction (2008)Probabilistic Estimation and Allocation of Project Time Contingency (2010)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)
this work references cited by second hop

References

  • 2001Project Management in Construction: Software Use and Research Directions133 cited
  • 2006Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects130 cited
  • 1971CPM in construction management126 cited

Cited by

  • 2018Improving workflow and resource usage in construction schedules through location-based management system (LBMS)46 cited
  • 2013Investigating the effect of construction management strategies on project greenhouse gas emissions using interactive simulation44 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work