Reasons for Cost and Schedule Increase for Engineering Design Projects
3 references·16 citing·40 second hop
Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Reasons for Cost and Schedule Increase fo…Critical Success Factors for Construction Projects (1992)Critical Success Factors for …Building Theories from Case Study Research (1989)Building Theories from Case S…Concurrent Delays in Construction Projects (1987)Concurrent Delays in Construc…Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis (2020)Cost Overrun Causative Factor…Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach (2018)Preventive Mitigation of Over…Causes of delays in the construction phase of Chinese building projects (2018)Causes of delays in the const…Investigating design changes in Malaysian building projects (2017)Investigating design changes …Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research (2015)Cost Overruns in Hydrocarbon …Analysis of Factors Affecting Design Changes in Construction Project with Partial Least Square (PLS) (2015)Analysis of Factors Affecting…Understanding the Landscape of Overruns in Transport Infrastructure Projects (2014)Understanding the Landscape o…Construction project control in the UK: Current practice, existing problems and recommendations for future improvement (2014)Construction project control …Causes of Cost Overrun In Construction (2014)Causes of Cost Overrun In Con…Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan (2013)Factors Affecting Time Overru…Overruns in transportation infrastructure projects (2012)Overruns in transportation in…Factors causing cost variation for constructing wastewater projects in Egypt (2012)Factors causing cost variatio…Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Preliminary Study on Causativ…Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts (2010)Three-Stage Least-Squares Ana…Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant (2010)Factors Affecting Constructio…Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach (2008)Estimating Cost Discrepancies…Questionnaire Design, Interviewing and Attitude Measurement (1993)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Causes of delay in large construction projects (2006)Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects (2014)The changing role of the information systems executive : a critical success factors perspective (1980)An assessment of critical success factors (1984)Framework of Success Criteria for Design/Build Projects (2002)A study on project success factors in large construction projects in Vietnam (2004)The impact of contractors’ attributes on construction project success: A post construction evaluation (2012)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes and effects of delays in Malaysian construction industry (2007)Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project (2020)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Controlling Cost Overrun Factors in Construction Projects in Malaysia (2013)Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden (2015)Statistical and Econometric Methods for Transportation Data Analysis (2003)Review of construction journals on causes of project cost overruns (2020)Causes of Quality Deviations in Design and Construction (1992)Taxonomy for change causes and effects in construction projects (2008)Exploring the underlying factors inducing design changes during building production (2018)Systemic View to Understanding Design Change Causation and Exploitation of Communications and Knowledge (2019)Theoretical review on critical risk factors in oil and gas construction projects in Yemen (2020)Qualitative Research: A Guide to Design and Implementation (2009)A primer on partial least squares structural equation modeling (PLS-SEM) (2014)A primer on partial least squares structural equation modeling (PLS-SEM) (2015)Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK (2019)Design Changes in Construction Projects – Causes and Impact on the Cost (2019)Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran (2020)Towards a Methodology for Developing Evidence‐Informed Management Knowledge by Means of Systematic Review (2003)Cost escalation and schedule delays in road construction projects in Zambia (2008)Systematic Review and Evidence Synthesis as a Practice and Scholarship Tool (2012)Causes of cost overruns in building construction projects in Asian countries; Iran as a case study (2022)Risk factors causing cost overruns in road networks (2022)Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects (2023)Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express (2009)Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia (2022)Value creation in E‐business (2001)Knowing in Practice: Enacting a Collective Capability in Distributed Organizing (2002)Seeking Qualitative Rigor in Inductive Research (2012)
this work references cited by second hop

References

  • 1989Building Theories from Case Study Research17,437 cited
  • 1992Critical Success Factors for Construction Projects479 cited
  • 1987Concurrent Delays in Construction Projects141 cited

Cited by

  • 2010Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant131 cited
  • 2011Preliminary Study on Causative Factors Leading to Construction Cost Overrun129 cited
  • 2010Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts109 cited
  • 2020Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis108 cited
  • 2017Investigating design changes in Malaysian building projects106 cited
  • 2015Analysis of Factors Affecting Design Changes in Construction Project with Partial Least Square (PLS)104 cited
  • 2012Overruns in transportation infrastructure projects102 cited
  • 2014Understanding the Landscape of Overruns in Transport Infrastructure Projects96 cited
  • 2014Construction project control in the UK: Current practice, existing problems and recommendations for future improvement95 cited
  • 2015Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research86 cited
  • 2012Factors causing cost variation for constructing wastewater projects in Egypt

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

84 cited
  • 2018Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach81 cited
  • 2013Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan78 cited
  • 2008Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach72 cited
  • 2018Causes of delays in the construction phase of Chinese building projects70 cited
  • 2014Causes of Cost Overrun In Construction70 cited