SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Evaluation of overall equipment effectiveness based on market
8 references·2 citing·31 second hop
Evaluation of overall equipment effectiveness based on market (2010)Evaluation of overall equipment effective…Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system (2006)Evaluation of overall line ef…Equipment Effectiveness: OEE Revisited (2005)Equipment Effectiveness: OEE …Cross‐functional team working for overall equipment effectiveness (OEE) (2003)Cross‐functional team working…Operational efficiency and effectiveness measurement (2001)Operational efficiency and ef…Overall equipment effectiveness as a measure of operational improvement – A practical analysis (2000)Overall equipment effectivene…Measurement of overall equipment effectiveness as a basis for TPM activities (1998)Measurement of overall equipm…Improving Capital Productivity through Maintenance (1994)Improving Capital Productivit…TPM Implementation: A Japanese Approach (1992)TPM Implementation: A Japanes…Overall equipment effectiveness (OEE) evaluation for an automated ice cream production line (2019)Overall equipment effectivene…Improving operation of the croissant production line through overall equipment effectiveness (OEE) (2018)Improving operation of the cr…Guide to Quality Control (1982)The Logic of Priorities (1982)Introducing OEE as a measure of lean Six Sigma capability (2010)An analysis of managerial factors affecting the implementation and use of overall equipment effectiveness (2015)From measuring overall equipment effectiveness (OEE) to overall resource effectiveness (ORE) (2015)Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE (1999)Manufacturing excellence through TPM implementation: a practical analysis (2006)Do it separately or simultaneously—An empirical analysis of a conjoint implementation of TQM and TPM on plant performance (2011)Lean and green in the transport and logistics sector – a case study of simultaneous deployment (2016)An evaluation of TPM implementation initiatives in an Indian manufacturing enterprise (2007)Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study (2013)Modeling and analysis of manufacturing systems (2016)Case Study Research: Design and Methods (1984)The balanced scorecard : measures that drive performance (1992)Qualitative Data Analysis (2008)Overall equipment effectiveness (OEE) and process capability (PC) measures (2010)Overall Equipment Effectiveness: Systematic Literature Review and Overview of Different Approaches (2020)Implementation of total productive maintenance: A case study (2003)Overall equipment effectiveness of a manufacturing line (OEEML) (2008)Why change programs don't produce change. (1991)Successful change programs begin with results. (1992)System Dynamics as a Structural Theory in Operations Management (2008)Factory Physics : Foundations of Manufacturing Management (1995)Performance measurement and performance management (1995)The performance measurement revolution: why now and what next? (1999)OEEand equipment effectiveness: an evaluation (2006)Modeling the performance prediction problem in industrial and organizational psychology. (1990)Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion (2008)Designing visual management in manufacturing from a user perspective (2019)Factors affecting successful implementation of total productive maintenance (1999)A study of total productive maintenance implementation (2001)
this work references cited by second hop

References

  • 2000Overall equipment effectiveness as a measure of operational improvement – A practical analysis308 cited
  • 1998Measurement of overall equipment effectiveness as a basis for TPM activities289 cited
  • 2001Operational efficiency and effectiveness measurement232 cited
  • 2003Cross‐functional team working for overall equipment effectiveness (OEE)122 cited
  • 2006Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system120 cited
  • 1994Improving Capital Productivity through Maintenance119 cited
  • 2005Equipment Effectiveness: OEE Revisited118 cited
  • 1992TPM Implementation: A Japanese Approach94 cited

Cited by

  • 2018Improving operation of the croissant production line through overall equipment effectiveness (OEE)47 cited
  • 2019Overall equipment effectiveness (OEE) evaluation for an automated ice cream production line40 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work