An efficient method for scheduling construction projects with resource constraints
7 references·1 citing·36 second hop
An efficient method for scheduling construction projects with resource constraints (2001)An efficient method for scheduling constr…Construction Planning, Programming and Control (1998)Construction Planning, Progra…Efficient priority rules for the resource‐constrained project scheduling problem (1996)Efficient priority rules for …A new heuristic solution method in resource-constrained project scheduling (1991)A new heuristic solution meth…Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Some efficient multi-heuristi…Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling (1989)Heuristic Performance and Net…Identifying the critical sequence in a resource constrained project (1988)Identifying the critical sequ…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Time-to-market vs. time-to-delivery (2003)Time-to-market vs. time-to-de…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment (2004)Evaluation of the Resource-Constrained Critical Path Method Algorithms (2005)Tying the pieces together: A normative framework for integrating sales and project operations (2006)Local search techniques for the generalized resource constrained project scheduling problem (1993)A heuristic for network project scheduling with random activity durations depending on the resource allocation (1998)Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling (2003)Journal of Industrial Engineering (2017)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application (1997)Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows (2001)Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach (2009)Activity networks: Project planning and control by network models (1977)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A Robust Genetic Algorithm for Resource Allocation in Project Scheduling (2001)Insertion techniques for static and dynamic resource-constrained project scheduling (2003)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Order of entry and performance in new markets (1988)Competing Against Time (1990)Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality (1992)Beyond the point of no return: On the management of deviations (2007)An on-time delivery improvement model for manufacturing organisations (2009)Accelerating time to impact: Deconstructing practices to achieve project value (2019)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Contractor selection innovation: examination of two decades' published research (2010)Construction project control in the UK: Current practice, existing problems and recommendations for future improvement (2014)SUBCONTRACTOR SELECTION USING THE INTEGRATION OF THE AHP AND PROMRTHEE METHODS (2015)
this work references cited by second hop

References

  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1996Efficient priority rules for the resource‐constrained project scheduling problem301 cited
  • 1990Some efficient multi-heuristic procedures for resource-constrained project scheduling261 cited
  • 1998Construction Planning, Programming and Control104 cited
  • 1989Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling90 cited
  • 1991A new heuristic solution method in resource-constrained project scheduling84 cited
  • 1988Identifying the critical sequence in a resource constrained project63 cited

Cited by

  • 2003Time-to-market vs. time-to-delivery50 cited