SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Extraction of Decision Alternatives in Project Management: Application of Hybrid PSO-SFLA
10 references·3 citing·46 second hopsampled
Extraction of Decision Alternatives in Project Management: Application of Hybrid PSO-SFLA (2013)Extraction of Decision Alternatives in Pr…Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)Extraction of decision altern…An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)An effective shuffled frog-le…Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem (2010)Particle swarm optimization w…A Neurogenetic approach for the resource-constrained project scheduling problem (2010)A Neurogenetic approach for t…A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (2009)A hybrid rank-based evolution…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Project Scheduling with Multi…A competitive genetic algorithm for resource-constrained project scheduling (1998)A competitive genetic algorit…Search Heuristics for Resource Constrained Project Scheduling (1996)Search Heuristics for Resourc…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…Selection and Resource Allocation Model for Upgrading Fire Safety of Historic Buildings (2016)Selection and Resource Alloca…Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem (2014)Backward-Forward Hybrid Genet…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Activity networks: Project planning and control by network models (1977)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (2016)Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (2019)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A fuzzy robust scheduling approach for product development projects (2003)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search (2004)Multimode Project Scheduling Based on Particle Swarm Optimization (2005)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Ant colony optimization for resource-constrained project scheduling (2002)Consolidated optimization algorithm for resource-constrained project scheduling problems (2017)Memetic algorithm for solving resource constrained project scheduling problems (2019)Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm (2019)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Resource-constrained project scheduling by simulated annealing (1996)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Finding of urban rainstorm and waterlogging disasters based on microblogging data and the location-routing problem model of urban emergency logistics (2018)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem (2017)On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (2017)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1998A competitive genetic algorithm for resource-constrained project scheduling569 cited
  • 2001Project Scheduling with Multiple Modes: A Genetic Algorithm286 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 1996Search Heuristics for Resource Constrained Project Scheduling153 cited
  • 2011An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem149 cited
  • 2011Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO130 cited
  • 2010A Neurogenetic approach for the resource-constrained project scheduling problem120 cited
  • 2009A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem96 cited
  • 2010Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem95 cited

Cited by

  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2014Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem47 cited
  • 2016Selection and Resource Allocation Model for Upgrading Fire Safety of Historic Buildings13 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work