Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
1 references·16 citing·44 second hop
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints (2008)Hybrid of genetic algorithm and simulated…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Resource-constrained multi-project scheduling problem: A survey (2022)Resource-constrained multi-pr…Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer (2022)Multi-project scheduling with…Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling (2022)Hybridization of reinforcemen…Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling (2020)Resource-constrained multi-pr…Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm (2019)Solving Resource-Constrained …Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival (2019)Research on priority rules fo…A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects (2019)A qualitative framework for s…Time-cost tradeoff analysis with minimized project financing cost (2018)Time-cost tradeoff analysis w…On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem (2017)On the performance of priorit…Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms (2015)Taking advantage of solving t…A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)A novel Multiple Objective Sy…Improved Critical Chain Project Management Framework for Scheduling Construction Projects (2014)Improved Critical Chain Proje…Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling (2014)Hybrid Genetic Algorithm with…A review of methods and algorithms for optimizing construction scheduling (2013)A review of methods and algor…Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Optimizing project selection …Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling (2011)Multiobjective Optimization o…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A review of methods, techniques and tools for project planning and control (2018)Time–cost–quality trade-off analysis for planning construction projects (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Construction Resource Scheduling with Genetic Algorithms (1996)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects (2012)An enhanced multi-objective optimization approach for risk allocation in public–private partnership projects: a case study of Malaysia (2013)Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm (2015)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Critical chain: the theory of constraints applied to project management (2000)On the merits and pitfalls of critical chain scheduling (2001)Optimized scheduling and buffering of repetitive construction projects under uncertainty (2016)Multi-objective optimization for repetitive scheduling under uncertainty (2019)An Overarching Review on Delay Analyses in Construction Projects (2021)PSPLIB - A project scheduling problem library (1997)Ant colony optimization for resource-constrained project scheduling (2002)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Multi-mode resource-constrained project scheduling problem with alternative project structures (2018)A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem (2020)Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm (2021)Complex Scheduling (2006)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities (2013)Modeling and solving the project selection and scheduling (2015)A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting (2020)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)The impact of shift and night work on health (1996)Shift work, safety and productivity (2003)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A genetic algorithm for the resource constrained multi-project scheduling problem (2007)Application of a Technique for Research and Development Program Evaluation (1959)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Extensions of the resource-constrained project scheduling problem (2023)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms (2024)
this work references cited by second hop

References

  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited

Cited by

  • 2015A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem164 cited
  • 2013A review of methods and algorithms for optimizing construction scheduling148 cited
  • 2022Resource-constrained multi-project scheduling problem: A survey98 cited
  • 2011Optimizing project selection and scheduling problems with time-dependent resource constraints93 cited
  • 2017On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem84 cited
  • 2019Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm78 cited
  • 2014Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling78 cited
  • 2014Improved Critical Chain Project Management Framework for Scheduling Construction Projects72 cited
  • 2011Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling70 cited
  • 2020Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling62 cited
  • 2022Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling53 cited
  • 2019Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

53 cited
  • 2019A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects51 cited
  • 2022Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer49 cited
  • 2018Time-cost tradeoff analysis with minimized project financing cost49 cited
  • 2015Taking advantage of solving the resource constrained multi-project scheduling problems using multi-modal genetic algorithms48 cited