SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Model for forecasting construction cost indices in Taiwan
8 references·0 citing·24 second hop
Model for forecasting construction cost indices in Taiwan (1998)Model for forecasting construction cost i…Journal of business forecasting (1996)Journal of business forecasti…Building price-level forecasting: an examination of techniques and applications (1987)Building price-level forecast…Time Series Analysis: Forecasting and Control (1977)Time Series Analysis: Forecas…Time Series Analysis: Forecasting and Control (1977)Time Series Analysis: Forecas…Testing for Serial Correlation in Least-Squares Regression When Some of the Regressors are Lagged Dependent Variables (1970)Testing for Serial Correlatio…Smoothing, Forecasting, and Prediction of Discrete Time Series (1965)Smoothing, Forecasting, and P…Smoothing, Forecasting and Prediction of Discrete Time Series. (1964)Smoothing, Forecasting and Pr…The Summation of Random Causes as the Source of Cyclic Processes (1937)The Summation of Random Cause…The Science of Decision Making. (1969)Forecasting construction cost escalation (1993)Models of UK private sector quarterly construction demand (1994)Construction Price Prediction Using Vector Error Correction Models (2013)DIAGNOSTIC CHECKING ARMA TIME SERIES MODELS USING SQUARED‐RESIDUAL AUTOCORRELATIONS (1983)Modeling and pricing long memory in stock market volatility (1996)Social Change and Crime Rate Trends: A Routine Activity Approach (1979) (2010)Application of Analytical Hierarchy Process in Operations Management (1990)Application of Delphi method in selection of procurement systems for construction projects (2001)Predicting consumer product demands via Big Data: the roles of online promotional marketing and online reviews (2015)Distribution of the Estimators for Autoregressive Time Series with a Unit Root (1979)Likelihood Ratio Statistics for Autoregressive Time Series with a Unit Root (1981)Generalized autoregressive conditional heteroskedasticity (1986)A pragmatic view of accuracy measurement in forecasting (1986)A dynamic artificial neural network model for forecasting time series events (2004)Sales forecasts in clothing industry: The key success factor of the supply chain management (2010)Macroeconomics and finance: The role of the stock market (1984)ARMA Models and the Box-Jenkins Methodology (1997)A simple framework for analysing bull and bear markets (2002)Relative accuracy of judgemental and extrapolative methods in forecasting annual earnings (1983)We need to talk about intermittent demand forecasting (2020)Stock movement prediction via gated recurrent unit network based on reinforcement learning with incorporated attention mechanisms (2021)Exponential smoothing: The state of the art (1985)Using daily stock returns (1985)
this work references cited by second hop

References

  • 1977Time Series Analysis: Forecasting and Control19,200 cited
  • 1977Time Series Analysis: Forecasting and Control6,446 cited
  • 1970Testing for Serial Correlation in Least-Squares Regression When Some of the Regressors are Lagged Dependent Variables1,184 cited
  • 1937The Summation of Random Causes as the Source of Cyclic Processes868 cited
  • 1965Smoothing, Forecasting, and Prediction of Discrete Time Series264 cited
  • 1996Journal of business forecasting234 cited
  • 1964Smoothing, Forecasting and Prediction of Discrete Time Series.93 cited
  • 1987Building price-level forecasting: an examination of techniques and applications50 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work