SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
16 references·16 citing·31 second hopsampled
Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis (1988)Evaluating Project Scheduling and Due Dat…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Introduction to Simulation and SLAM (1979)Introduction to Simulation an…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…A Horizon-Varying, Zero-One Approach to Project Scheduling (1974)A Horizon-Varying, Zero-One A…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)An Algorithm for Optimal Proj…Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case (1970)Solving Resource-Constrained …Production-Inventory Systems: Planning and Control (1969)Production-Inventory Systems:…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A Heuristic Model for Schedul…Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling (2020)Resource-constrained multi-pr…Don’t fear the meter: How longer time limits bias managers to prefer hiring with flat fee compensation (2020)Don’t fear the meter: How lon…More Time, More Work: How Time Limits Bias Estimates of Task Scope and Project Duration (2019)More Time, More Work: How Tim…On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem (2017)On the performance of priorit…Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (2015)Resource Constrained Multi-Pr…More Time, More Work: How Time Limits Bias Estimates of Project Duration and Scope (2015)More Time, More Work: How Tim…Resource Constrained Multi-project Scheduling with Priority Rules & Analytic Hierarchy Process (2014)Resource Constrained Multi-pr…Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow (2010)Profit Optimization for Multi…Managing and modelling general resource transfers in (multi-)project scheduling (2008)Managing and modelling genera…An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling (2006)An event-driven approach with…The Evolution of Software Quality in Project Scheduling (1999)The Evolution of Software Qua…The Effects of Learning, Forgetting, and Relearning on Decision Rule Performance in Multiproject Scheduling (1999)The Effects of Learning, Forg…Project Scheduling with Stochastic Activity Interruptions (1999)Project Scheduling with Stoch…An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment (1997)An evaluation of due date, re…A comparison of resource allocation and activity scheduling rules in a dynamic multi‐project environment (1993)A comparison of resource allo…Multiproject staff scheduling with variable resource constraints (1992)Multiproject staff scheduling…Activity networks: Project planning and control by network models (1977)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Application of a Technique for Research and Development Program Evaluation (1959)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)A Unifying View of Hybrid Simulation/Analytic Models and Modeling (1983)CSIM (1986)Discrete-event simulation: from the pioneers to the present, what next? (2004)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Resource-constrained project scheduling by simulated annealing (1996)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)A Cooperative Game Theory Model of Quantity Discounts (1989)Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method (1994)A new approach to forecasting intermittent demand for service parts inventories (2003)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1979Introduction to Simulation and SLAM442 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1969Production-Inventory Systems: Planning and Control269 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 1976Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation174 cited
  • 1971An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints165 cited
  • 1967A Heuristic Model for Scheduling Large Projects with Limited Resources164 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

147 cited
  • 1970Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case146 cited
  • 1974A Horizon-Varying, Zero-One Approach to Project Scheduling144 cited
  • Cited by

    • 2008Managing and modelling general resource transfers in (multi-)project scheduling85 cited
    • 2017On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem84 cited
    • 2020Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling62 cited
    • 2010Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow57 cited
    • 1993A comparison of resource allocation and activity scheduling rules in a dynamic multi‐project environment55 cited
    • 1997An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment48 cited
    • 2014Resource Constrained Multi-project Scheduling with Priority Rules & Analytic Hierarchy Process45 cited
    • 1999The Effects of Learning, Forgetting, and Relearning on Decision Rule Performance in Multiproject Scheduling43 cited
    • 1999Project Scheduling with Stochastic Activity Interruptions40 cited
    • 2015Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times38 cited
    • 2006An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling37 cited
    • 1992Multiproject staff scheduling with variable resource constraints34 cited
    • 1999The Evolution of Software Quality in Project Scheduling31 cited
    • 2020Don’t fear the meter: How longer time limits bias managers to prefer hiring with flat fee compensation4 cited
    • 2015More Time, More Work: How Time Limits Bias Estimates of Project Duration and Scope2 cited
    • 2019More Time, More Work: How Time Limits Bias Estimates of Task Scope and Project Duration1 cited