SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Improving the performance of Earned Value Analysis as a construction project management tool
0 references·6 citing·20 second hop
Improving the performance of Earned Value Analysis as a construction project management tool (2000)Improving the performance of Earned Value…Monitoring of Time and Cost Variances of Schedule Using Simple Earned Value Method Indicators (2021)Monitoring of Time and Cost V…The S-Curve as a Tool for Planning and Controlling of Construction Process—Case Study (2020)The S-Curve as a Tool for Pla…Structural risk of diversified project financing of city investment company in China based on the best worst method (2019)Structural risk of diversifie…Predicting the project time and costs using EVM based on gray numbers (2019)Predicting the project time a…Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation (2016)Cost Performance as a Stochas…PROJECT PERFORMANCE MONITORING METHODS USED IN MALAYSIA AND PERSPECTIVES OF INTRODUCING EVA AS A STANDARD APPROACH / MALAIZIJOJE NAUDOJAMI PROJEKTŲ EFEKTYVUMO STEBĖJIMO METODAI IR GALIMYBĖS EVA NAUDOTI KAIP STANDARTINĘ METODIKĄ (2011)PROJECT PERFORMANCE MONITORIN…Project management : a systems approach to planning, scheduling, and controlling (1995)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Earned Value Project Management Method and Extensions (2003)AN EARLY COST ESTIMATION MODEL FOR HYDROELECTRIC POWER PLANT PROJECTS USING NEURAL NETWORKS AND MULTIPLE REGRESSION ANALYSIS (2015)Simulation Modeling and Analysis. (1983)A Guide to the project management body of knowledge (1996)A guide to the project management body of knowledge (PMBOK guide) (2004)A comparison of different project duration forecasting methods using earned value metrics (2005)A grey-based decision-making approach to the supplier selection problem (2006)CAPITAL ASSET PRICES: A THEORY OF MARKET EQUILIBRIUM UNDER CONDITIONS OF RISK* (1964)Towards a Methodology for Developing Evidence‐Informed Management Knowledge by Means of Systematic Review (2003)Best-worst multi-criteria decision-making method (2014)Research on PPP Enterprise Credit Dynamic Prediction Model (2022)Risk assessment model for international construction projects considering risk interdependence using the DEMATEL method (2022)Unsupervised machine learning for project stakeholder classification: Benefits and limitations (2023)Risk assessment of construction projects (2010)Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study (2017)Monitoring systems and their effectiveness for project cost control in construction (2002)Time and Cost Performance of Design–Build Projects (2015)Framework for systematic adoption of ERP systems in the Sri Lankan construction industry (2025)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2021Monitoring of Time and Cost Variances of Schedule Using Simple Earned Value Method Indicators35 cited
  • 2020The S-Curve as a Tool for Planning and Controlling of Construction Process—Case Study32 cited
  • 2011PROJECT PERFORMANCE MONITORING METHODS USED IN MALAYSIA AND PERSPECTIVES OF INTRODUCING EVA AS A STANDARD APPROACH / MALAIZIJOJE NAUDOJAMI PROJEKTŲ EFEKTYVUMO STEBĖJIMO METODAI IR GALIMYBĖS EVA NAUDOTI KAIP STANDARTINĘ METODIKĄ29 cited
  • 2016Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation26 cited
  • 2019Predicting the project time and costs using EVM based on gray numbers25 cited
  • 2019Structural risk of diversified project financing of city investment company in China based on the best worst method21 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work