Simplified Plant Analysis Risk (SPAR) Human Reliability Analysis (HRA) Methodology: Comparisons with Other HRA Methods
7 references·0 citing·28 second hop
Simplified Plant Analysis Risk (SPAR) Human Reliability Analysis (HRA) Methodology: Comparisons with Other HRA Methods (2000)Simplified Plant Analysis Risk (SPAR) Hum…A data-based method for assessing and reducing human error to improve operational performance (2003)A data-based method for asses…Cognitive Reliability and Error Analysis Method (CREAM) (1998)Cognitive Reliability and Err…The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI (1997)The development of a nuclear …Advances in human reliability analysis methodology. Part I: frameworks, models and data (1994)Advances in human reliability…Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR) (1992)Nuclear Computerized Library …Accident Sequence Evaluation Program: Human reliability analysis procedure (1987)Accident Sequence Evaluation …Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report (1983)Handbook of human-reliability…Handbook of human reliability analysis with emphasis on nuclear power plant applications (1985)A task analysis-linked approach for integrating the human factor in reliability assessments of nuclear power plants (1988)A review of NRC staff uses of probabilistic risk assessment (1994)Risk-informed design of IRIS using a level-1 probabilistic risk assessment from its conceptual design phase (2004)The Influence of Length and Frequency of Training Session on the Rate of Learning to Type (1978)The validation of three human reliability quantification techniques — THERP, HEART and JHEDI: Part 1 — technique descriptions and validation issues (1996)A taxonomy of performance influencing factors for human reliability analysis of emergency tasks (2003)Review of techniques and challenges of human and organizational factors analysis in maritime transportation (2021)Post-event human decision errors: operator action tree/time reliability correlation (1982)Human reliability analysis—where shouldst thou turn? (1990)Incorporating management and organisational factors into probabilistic safety assessment (1992)Assessment of human reliability based on evaluation of plant experience: requirements and implementation (1999)Human reliability modeling for the Next Generation System Code (2012)Human reliability assessment (HRA) in maintenance of production process: a case study (2016)The Method of Paired Comparisons. (1964)New technology and human error (1988)Human Reliability Analysis: Context and Control (1994)Structured information analysis for human reliability analysis of emergency tasks in nuclear power plants (2001)Human Reliability Assessment (2008)A statistical approach to estimating effects of performance shaping factors on human error probabilities of soft controls (2015)Human reliability analysis: Need, status, trends and limitations (1990)A simplified CREAM prospective quantification process and its application (2007)A fuzzy Bayesian network approach to improve the quantification of organizational influences in HRA frameworks (2012)The Concept of Probability in Safety Assessments of Technological Systems (1990)The paradoxes of almost totally safe transportation systems (2001)How Useful Is Quantitative Risk Assessment? (2004)Driver distraction and driver inattention: Definition, relationship and taxonomy (2011)A Human Error Approach to Aviation Accident Analysis (2017)
this work references cited by second hop

References

  • 1983Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report1,460 cited
  • 1998Cognitive Reliability and Error Analysis Method (CREAM)1,101 cited
  • 2003A data-based method for assessing and reducing human error to improve operational performance321 cited
  • 1987Accident Sequence Evaluation Program: Human reliability analysis procedure234 cited
  • 1994Advances in human reliability analysis methodology. Part I: frameworks, models and data68 cited
  • 1997The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI57 cited
  • 1992Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR)22 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work