SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Expected Critical Path Lengths in PERT Networks
1 references·16 citing·33 second hop
Expected Critical Path Lengths in PERT Networks (1962)Expected Critical Path Lengths in PERT Ne…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…A Systematic Literature Review for Personnel Scheduling Problems (2020)A Systematic Literature Revie…M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics (2017)M-PERT: Manual Project-Durati…Stability and resource allocation in project planning (2004)Stability and resource alloca…On latest starting times and floats in activity networks with ill-known durations (2003)On latest starting times and …A review of the contribution of Operational Research to Project Management (2002)A review of the contribution …Simplified Program Evaluation and Review Technique (PERT) (1999)Simplified Program Evaluation…Stochastic and Fuzzy Pert (1997)Stochastic and Fuzzy PertStochastic and fuzzy Pert (1989)Stochastic and fuzzy PertMarkov and Markov-Regenerative pert Networks (1986)Markov and Markov-Regenerativ…Bounding the Project Completion Time Distribution in PERT Networks (1985)Bounding the Project Completi…The Completion Time of PERT Networks (1983)The Completion Time of PERT N…Bounding distributions for a stochastic pert network (1977)Bounding distributions for a …Technical Note—Expected Completion Time in Pert Networks (1976)Technical Note—Expected Compl…Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding Distributions for a …On the Expected Duration of PERT Type Networks (1967)On the Expected Duration of P…A Statistical Theory for PERT Critical Path Analysis (1966)A Statistical Theory for PERT…The use of fuzzy variables in pert (1981)Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (2003)On computing the latest starting times and floats of activities in a network with imprecise durations (2004)Using Ant Colony Optimization algorithm for solving project management problems (2009)Project scheduling under uncertainty using fuzzy modelling and solving techniques (2012)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management. Tasks, Responsibilities, Practices. (1975)The New Science of Management Decision (1978)Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach (2009)Total Cost Control in Project Management via Satisficing (2013)Inter‐phase feedbacks in construction projects (2015)Risk, Uncertainty and Profit (1921)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The trade-off between stability and makespan in resource-constrained project scheduling (2005)A tabu search procedure for developing robust predictive project schedules (2007)An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis (1971)On criticality and sensitivity in activity networks (2000)Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)A Random Activity Network Generator (1993)Activity networks: Project planning and control by network models (1977)Robust optimization for resource-constrained project scheduling with uncertain activity durations (2012)New strategies for stochastic resource-constrained project scheduling (2017)Critical Path Analyses Via Chance Constrained and Stochastic Programming (1964)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Project scheduling problem with stochastic activity duration times (2004)Computational complexity of PERT problems (1988)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic resource-constrained project scheduling (2001)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited

Cited by

  • 1986Markov and Markov-Regenerative pert Networks184 cited
  • 1985Bounding the Project Completion Time Distribution in PERT Networks179 cited
  • 2004Stability and resource allocation in project planning145 cited
  • 1971Bounding Distributions for a Stochastic Acyclic Network132 cited
  • 2002A review of the contribution of Operational Research to Project Management113 cited
  • 2003On latest starting times and floats in activity networks with ill-known durations103 cited
  • 1967On the Expected Duration of PERT Type Networks100 cited
  • 1966A Statistical Theory for PERT Critical Path Analysis92 cited
  • 1977Bounding distributions for a stochastic pert network91 cited
  • 1999Simplified Program Evaluation and Review Technique (PERT)89 cited
  • 1997Stochastic and Fuzzy Pert77 cited
  • 2020A Systematic Literature Review for Personnel Scheduling Problems69 cited
  • 1983The Completion Time of PERT Networks68 cited
  • 1989Stochastic and fuzzy Pert65 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2017
M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics
59 cited
  • 1976Technical Note—Expected Completion Time in Pert Networks59 cited