SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
An evolutionary algorithm for resource-constrained project scheduling
14 references·4 citing·29 second hop
An evolutionary algorithm for resource-constrained project scheduling (2002)An evolutionary algorithm for resource-co…Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem (1999)Tabu Search Algorithms and Lo…Project scheduling : recent models, algorithms, and applications (1999)Project scheduling : recent m…A Classification Scheme for Project Scheduling (1999)A Classification Scheme for P…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …A competitive genetic algorithm for resource-constrained project scheduling (1998)A competitive genetic algorit…Search Heuristics for Resource Constrained Project Scheduling (1996)Search Heuristics for Resourc…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Resource allocation via dynamic programming in activity networks (1993)Resource allocation via dynam…An iterative scheduling technique for resource-constrained project scheduling (1992)An iterative scheduling techn…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Schedule Optimization Using Genetic Algorithms (1991)Schedule Optimization Using G…A decomposition approach to multi-project scheduling (1991)A decomposition approach to m…Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Some efficient multi-heuristi…Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Computational experience with…Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling (2021)Quantum-Inspired Genetic Algo…Ensembles of priority rules for resource constrained project scheduling problem (2021)Ensembles of priority rules f…Extending the RCPSP for modeling and solving disruption management problems (2008)Extending the RCPSP for model…Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (2007)Evolutionary algorithms appli…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Project Management With Cpm, Pert and Precedence Diagramming (1983)Project management — A managerial approach (1989)Justification and RCPSP: A technique that pays (2004)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A fuzzy robust scheduling approach for product development projects (2003)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search (2004)Multimode Project Scheduling Based on Particle Swarm Optimization (2005)Activity networks: Project planning and control by network models (1977)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Construction Resource Scheduling with Genetic Algorithms (1996)A genetic algorithm approach to a general category project scheduling problem (1999)Location allocation modeling for healthcare facility planning in Malaysia (2012)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Project Scheduling—Theory and Practice (2005)A hybrid setup for a hybrid scenario: combining heuristics for the home health care problem (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)
this work references cited by second hop

References

  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1998A competitive genetic algorithm for resource-constrained project scheduling569 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 1991Schedule Optimization Using Genetic Algorithms499 cited
  • 1999Project scheduling : recent models, algorithms, and applications352 cited
  • 1992An iterative scheduling technique for resource-constrained project scheduling263 cited
  • 1990Some efficient multi-heuristic procedures for resource-constrained project scheduling261 cited
  • 1999A Classification Scheme for Project Scheduling195 cited
  • 1996Search Heuristics for Resource Constrained Project Scheduling153 cited
  • 1990Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems128 cited
  • 1993Resource allocation via dynamic programming in activity networks117 cited
  • 1999Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem100 cited
  • 1991A decomposition approach to multi-project scheduling82 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Cited by

  • 2021Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling68 cited
  • 2021Ensembles of priority rules for resource constrained project scheduling problem66 cited
  • 2008Extending the RCPSP for modeling and solving disruption management problems42 cited
  • 2007Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art42 cited