Combined Discrete-Event/Continuous Simulation for Project Planning
7 references·8 citing·35 second hop
Combined Discrete-Event/Continuous Simulation for Project Planning (1997)Combined Discrete-Event/Continuous Simula…Masonry Productivity Forecasting Model (1993)Masonry Productivity Forecast…Slam II network models for decision support (1989)Slam II network models for de…Simulation Model to Forecast Project Completion Time (1985)Simulation Model to Forecast …Climatic Effects on Construction (1985)Climatic Effects on Construct…Simulation of Construction Project Duration (1979)Simulation of Construction Pr…Introduction to simulation and SLAM II (1979)Introduction to simulation an…An Analytical Study of the PERT Assumptions (1964)An Analytical Study of the PE…Exploring the adoption of technology against delays in construction projects (2022)Exploring the adoption of tec…A Generic Framework for Hybrid Simulation in Healthcare (2016)A Generic Framework for Hybri…Optimization of Change Order Management Process with Object-Oriented Discrete Event Simulation: Case Study (2015)Optimization of Change Order …A hybrid SD–DES simulation approach to model construction projects (2015)A hybrid SD–DES simulation ap…Hybrid simulation for modelling large systems: An example of integrated care model (2012)Hybrid simulation for modelli…Probabilistic Duration Estimation Model for High-Rise Structural Work (2009)Probabilistic Duration Estima…Project scheduling and monitoring: current research status (2004)Project scheduling and monito…Modeling the Construction Management Process to Support Situational Simulations (2003)Modeling the Construction Man…Factors Affecting Masonry‐Labor Productivity (1991)Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes (2001)Analysis of labour productivity of formwork operations in building construction (2010)Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm (2021)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Scheduling Projects with Repeating Activities (1998)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects (2015)Causes of Delay in the Construction Industry (1971)Project Management: Techniques in Planning and Controlling Construction Projects (1984)Probability of Project Completion Using Stochastic Project Scheduling Simulation (2005)Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (2007)A progress report on the training of probability assessors (1982)Calibration of probabilities: The state of the art to 1980 (1982)Judgement under Uncertainty: Heuristics and Biases (1983)Nonlinear dynamic analysis method for large-scale single-layer lattice domes with uncertain-but-bounded parameters (2019)Construction delay: a quantitative analysis (2000)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Practical proposals for managing uncertainty and risk in project planning (1998)Dynamic planning of construction activities using hybrid simulation (2014)Changing the paradigm: Simulation, now a method of first resort (2015)HSM-Simulation–Based Planning Method for Construction Projects (1995)Model for Evaluating Networks under Correlated Uncertainty—NETCOR (2000)Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects (2020)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)The use of fuzzy variables in pert (1981)Impact of Rainfall on the Productivity of Highway Construction (2001)Impact of Change’s Timing on Labor Productivity (2005)Weather-Related Construction Delays in a Changing Climate: A Systematic State-of-the-Art Review (2021)Steady-state simulation of queueing processes: survey of problems and solutions (1990)Traffic modeling for telecommunications networks (1994)PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE (1997)
this work references cited by second hop

References

  • 1979Introduction to simulation and SLAM II1,233 cited
  • 1964An Analytical Study of the PERT Assumptions283 cited
  • 1985Climatic Effects on Construction148 cited
  • 1985Simulation Model to Forecast Project Completion Time104 cited
  • 1989Slam II network models for decision support101 cited
  • 1993Masonry Productivity Forecasting Model64 cited
  • 1979Simulation of Construction Project Duration59 cited

Cited by

  • 2004Project scheduling and monitoring: current research status55 cited
  • 2022Exploring the adoption of technology against delays in construction projects53 cited
  • 2009Probabilistic Duration Estimation Model for High-Rise Structural Work47 cited
  • 2012Hybrid simulation for modelling large systems: An example of integrated care model43 cited
  • 2015A hybrid SD–DES simulation approach to model construction projects42 cited
  • 2003Modeling the Construction Management Process to Support Situational Simulations40 cited
  • 2016A Generic Framework for Hybrid Simulation in Healthcare39 cited
  • 2015Optimization of Change Order Management Process with Object-Oriented Discrete Event Simulation: Case Study33 cited