SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
FLORA: New Forensic Schedule Analysis Technique
16 references·3 citing·29 second hop
FLORA: New Forensic Schedule Analysis Technique (2008)FLORA: New Forensic Schedule Analysis Tec…Schedule Delay Analysis (2016)Schedule Delay AnalysisSchedule Analysis under the Effect of Resource Allocation (2007)Schedule Analysis under the E…Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Preallocation of Total Float …Float Consumption Impact on Cost and Schedule in the Construction Industry (2007)Float Consumption Impact on C…Selecting a delay analysis method in resolving construction claims (2005)Selecting a delay analysis me…Object-Oriented Scheduling for Repetitive Projects with Soft Logics (2005)Object-Oriented Scheduling fo…Modified But-For Method for Delay Analysis (2005)Modified But-For Method for D…Delay Analysis Method Using Delay Section (2005)Delay Analysis Method Using D…Daily Windows Delay Analysis (2005)Daily Windows Delay AnalysisConstruction Delay Computation Method (2001)Construction Delay Computatio…Construction delay analysis techniques (1996)Construction delay analysis t…“Claimsmanship”: Current Perspective (1993)“Claimsmanship”: Current Pers…Total Float Traded as Commodity (1991)Total Float Traded as Commodi…The Development of the Construction Engineer: Past Progress and Future Problems (1991)The Development of the Constr…Sequencing Knowledge for Construction Scheduling (1991)Sequencing Knowledge for Cons…Soft Logic in Network Analysis (1988)Soft Logic in Network AnalysisReview of Resource-Constrained Scheduling Algorithms (2019)Review of Resource-Constraine…Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices (2014)Integrated Approach to Overco…Concurrent Delays and Apportionment of Damages (2010)Concurrent Delays and Apporti…Concurrent Delays in Construction Projects (1987)Computer aided construction delay analysis and claims preparation (1995)Delay Analysis within Construction Contracting Organizations (2008)Critical path effect based delay analysis method for construction projects (2011)Causes of Construction Delays in Countries with High Geopolitical Risks (2016)Causes of Delay in Large Building Construction Projects (1995)Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating (2004)Significant factors causing delay in the UAE construction industry (2006)Delays in construction projects: The case of Jordan (2007)Construction Delay Claims (1987)Comparison of Delay Analysis Methodologies (1998)Comparative study of delay factors in Libyan and the UK construction industry (2012)Probabilistic Monitoring of Project Performance Using SS-Curves (2000)Probabilistic Forecasting of Project Performance Using Stochastic S Curves (2004)Effect of organizational culture on delay in construction (2016)The top 10 universal delay factors in construction projects (2018)Effect of resource constraints on float calculations in project networks (1996)Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Scheduling of large, complex, and constrained construction projects - an exploration of LPS application (2014)Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach (2016)Modeling dynamic construction work template from existing scheduling records via sequential machine learning (2020)The effects of construction delays on project delivery in Nigerian construction industry (2002)Causes and effects of delays in Malaysian construction industry (2007)Importance of Capacity Constraints to Construction Cost and Schedule (2000)Evaluation of the Resource-Constrained Critical Path Method Algorithms (2005)Litigation in Construction Contracts: Literature Review (2019)Analysis Methods in Time-Based Claims (2008)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects (2023)
this work references cited by second hop

References

  • 2005Selecting a delay analysis method in resolving construction claims212 cited
  • 1996Construction delay analysis techniques160 cited
  • 2001Construction Delay Computation Method93 cited
  • 1991Sequencing Knowledge for Construction Scheduling84 cited
  • 2005Daily Windows Delay Analysis83 cited
  • 2016Schedule Delay Analysis64 cited
  • 1991The Development of the Construction Engineer: Past Progress and Future Problems58 cited
  • 2007Float Consumption Impact on Cost and Schedule in the Construction Industry55 cited
  • 2005Delay Analysis Method Using Delay Section51 cited
  • 1991Total Float Traded as Commodity48 cited
  • 2007Schedule Analysis under the Effect of Resource Allocation48 cited
  • 2005Modified But-For Method for Delay Analysis45 cited
  • 1993“Claimsmanship”: Current Perspective43 cited
  • 2005Object-Oriented Scheduling for Repetitive Projects with Soft Logics42 cited
  • 2007Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract41 cited
  • 1988Soft Logic in Network Analysis

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

40 cited

Cited by

  • 2019Review of Resource-Constrained Scheduling Algorithms27 cited
  • 2014Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices25 cited
  • 2010Concurrent Delays and Apportionment of Damages25 cited