SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
16 references·0 citing·31 second hop
Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm (2010)Comparing Schedule Generation Schemes in …Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects (2006)Parallel Genetic Algorithms f…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Resource Optimization Using Combined Simulation and Genetic Algorithms (2003)Resource Optimization Using C…A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A new efficient simulated ann…Application of genetic algorithms to construction scheduling with or without resource constraints (2002)Application of genetic algori…Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)Experimental evaluation of st…Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem (1999)Tabu Search Algorithms and Lo…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…A competitive genetic algorithm for resource-constrained project scheduling (1998)A competitive genetic algorit…A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A branch and bound algorithm …PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Search Heuristics for Resource Constrained Project Scheduling (1996)Search Heuristics for Resourc…Resource-constrained project scheduling by simulated annealing (1996)Resource-constrained project …Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A Robust Genetic Algorithm for Resource Allocation in Project Scheduling (2001)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)Justification and RCPSP: A technique that pays (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Activity networks: Project planning and control by network models (1977)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case (2017)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)An integrated survey of deterministic project scheduling (2001)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)
this work references cited by second hop

References

  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1998A competitive genetic algorithm for resource-constrained project scheduling569 cited
  • 2003A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version511 cited
  • 2000Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem503 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1998A branch and bound algorithm for the resource-constrained project scheduling problem323 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1996Resource-constrained project scheduling by simulated annealing174 cited
  • 1996Search Heuristics for Resource Constrained Project Scheduling153 cited
  • 2003Resource Optimization Using Combined Simulation and Genetic Algorithms130 cited
  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 1999Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

100 cited
  • 2006Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects83 cited
  • 2002Application of genetic algorithms to construction scheduling with or without resource constraints73 cited
  • Cited by

    No citing works inside the corpus for this window.