Resource-driven scheduling of repetitive activities
6 references·16 citing·31 second hop
Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of repetitive …RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Application of Linear Scheduling (1986)Application of Linear Schedul…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …Construction Planning for Linear Projects (1980)Construction Planning for Lin…Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects (2019)Multipurpose linear programmi…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions (2016)Linear scheduling with multip…Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic (2016)Genetic Algorithm–Based Metho…Effects of the location-based management system on production rates and productivity (2014)Effects of the location-based…Optimized acceleration of repetitive construction projects (2013)Optimized acceleration of rep…Project Management with Dynamic Scheduling (2012)Project Management with Dynam…LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)LOB and CPM Integrated Method…Empirical Research on the Success of Production Control in Building Construction Projects (2009)Empirical Research on the Suc…Automated trade‐off between time and cost in planning repetitive construction projects (2009)Automated trade‐off between t…Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Strategic-Operational Constru…Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Model-based dynamic resource management for construction projects (2005)Model-based dynamic resource …Optimized Scheduling of Linear Projects (2003)Optimized Scheduling of Linea…Optimum Planning of Highway Construction under A + B Bidding Method (2001)Optimum Planning of Highway C…Effect of learning on line-of-balance scheduling (2001)Modern Construction Management (2012)Response Surface Methodology: Process and Product Optimization Using Designed Experiments (1996)Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)System Dynamics: Systems Thinking and Modeling for a Complex World (2002)Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction (2010)Dynamics of Working Hours in Construction (2011)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Professional Construction Management (1976)Scheduling project networks with resource constraints and time windows (1988)Scheduling Projects with Repeating Activities (1998)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Factors Affecting the Cost of Airplanes (1936)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Setting tolerance limits for statistical project control using earned value management (2014)A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (2016)Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking (2018)New Generation of Planning Structures (1993)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)
this work references cited by second hop

References

  • 1990RPM: Repetitive Project Modeling176 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1986Application of Linear Scheduling128 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited

Cited by

  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • 2008Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach105 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 2012Project Management with Dynamic Scheduling105 cited
  • 2012LOB and CPM Integrated Method for Scheduling Repetitive Projects100 cited
  • 2005Model-based dynamic resource management for construction projects75 cited
  • 2016Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic64 cited
  • 2013Optimized acceleration of repetitive construction projects63 cited
  • 2019Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

63 cited
  • 2003Optimized Scheduling of Linear Projects59 cited
  • 2014Effects of the location-based management system on production rates and productivity54 cited
  • 2016Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions54 cited
  • 2009Empirical Research on the Success of Production Control in Building Construction Projects54 cited
  • 2009Automated trade‐off between time and cost in planning repetitive construction projects52 cited
  • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
  • 2001Optimum Planning of Highway Construction under A + B Bidding Method51 cited