SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
16 references·4 citing·21 second hop
Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling (2011)Ant Colony Optimization for Multimode Res…A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A genetic algorithm for the p…A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems (2007)A combinatorial particle swar…A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem (2006)A Branch-and-Cut Procedure fo…Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Solving the Multi-Mode Resour…Ant colony optimization for resource-constrained project scheduling (2002)Ant colony optimization for r…Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Project Scheduling with Multi…Scheduling of Resource-Constrained Projects (2000)Scheduling of Resource-Constr…Project scheduling with multiple modes: A comparison of exact algorithms (1998)Project scheduling with multi…Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)Multi-mode resource-constrain…A competitive genetic algorithm for resource-constrained project scheduling (1998)A competitive genetic algorit…An exact algorithm for project scheduling with multiple modes (1997)An exact algorithm for projec…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Hierarchical models for multi-project planning and scheduling (1993)Hierarchical models for multi…Heuristics for scheduling projects with resource restrictions and several resource-duration modes (1993)Heuristics for scheduling pro…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)AN ALGORITHM FOR A GENERAL CL…Integrated multi-project planning and scheduling - a multiagent approach (2022)Integrated multi-project plan…Scheduling resource-constrained project problem with alternative activity chains (2017)Scheduling resource-constrain…Team based labour assignment methodology for new product development projects (2016)Team based labour assignment …Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem (2016)Hybridization of genetic algo…PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Ant colony optimization for disaster relief operations (2007)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling (2001)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)Activity networks: Project planning and control by network models (1977)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Resource-constrained project scheduling problem: review of past and recent developments (2018)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Resource-constrained project scheduling: A survey of recent developments (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)
this work references cited by second hop

References

  • 2002Ant colony optimization for resource-constrained project scheduling760 cited
  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1998A competitive genetic algorithm for resource-constrained project scheduling569 cited
  • 2009A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem310 cited
  • 2007A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems307 cited
  • 2001Project Scheduling with Multiple Modes: A Genetic Algorithm286 cited
  • 2003Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms251 cited
  • 1998Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm242 cited
  • 1997An exact algorithm for project scheduling with multiple modes195 cited
  • 2000Scheduling of Resource-Constrained Projects181 cited
  • 1989AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS163 cited
  • 2006A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem163 cited
  • 1993Heuristics for scheduling projects with resource restrictions and several resource-duration modes

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

156 cited
  • 1998Project scheduling with multiple modes: A comparison of exact algorithms147 cited
  • 1993Hierarchical models for multi-project planning and scheduling143 cited
  • Cited by

    • 2017Scheduling resource-constrained project problem with alternative activity chains50 cited
    • 2016Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem47 cited
    • 2022Integrated multi-project planning and scheduling - a multiagent approach43 cited
    • 2016Team based labour assignment methodology for new product development projects10 cited