Algorithm for Determining Controlling Path Considering Resource Continuity
12 references·5 citing·21 second hop
Algorithm for Determining Controlling Path Considering Resource Continuity (2001)Algorithm for Determining Controlling Pat…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…New Generation of Planning Structures (1993)New Generation of Planning St…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Time Space Scheduling Method (1982)Time Space Scheduling MethodLinear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Simulation of Repetitive-Unit Construction (1980)Simulation of Repetitive-Unit…Construction Planning for Linear Projects (1980)Construction Planning for Lin…VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration (2016)Mixed-Integer Linear Programm…Impacts of different objective functions on resource leveling in Line-of-Balance scheduling (2015)Impacts of different objectiv…Linear projects scheduling using spreadsheets features (2011)Linear projects scheduling us…Accelerating linear projects (2005)Accelerating linear projectsScheduling system with focus on practical concerns in repetitive projects (2004)Scheduling system with focus …Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Effect of learning on line-of-balance scheduling (2001)Modern Construction Management (2012)Project Management With Cpm, Pert and Precedence Diagramming (1983)Planning and analysis of construction operations (1992)Evolutionary resource scheduler for linear projects (2007)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Application of Linear Scheduling (1986)Formal Development of Line‐of‐Balance Technique (1990)Work Continuity Constraints in Project Scheduling (2005)Optimizing linear project scheduling with multi-skilled crews (2012)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)
this work references cited by second hop

References

  • 1998Scheduling Projects with Repeating Activities309 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993New Generation of Planning Structures113 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 1982Time Space Scheduling Method96 cited
  • 1980Simulation of Repetitive-Unit Construction73 cited

Cited by

  • 2016Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration36 cited
  • 2004Scheduling system with focus on practical concerns in repetitive projects31 cited
  • 2011Linear projects scheduling using spreadsheets features30 cited
  • 2015

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Impacts of different objective functions on resource leveling in Line-of-Balance scheduling
29 cited
  • 2005Accelerating linear projects26 cited