SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Quantified Impacts of Project Change
16 references·16 citing·35 second hopsampled
Quantified Impacts of Project Change (2006)Quantified Impacts of Project ChangeChange Orders Impact on Labor Productivity (2005)Change Orders Impact on Labor…Structuring a delay and disruption claim: An application of cause-mapping and system dynamics (2003)Structuring a delay and disru…The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects (2000)The role of feedback dynamics…Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)Business Dynamics: Systems Th…Impact of Change Orders on Labor Efficiency for Electrical Construction (1999)Impact of Change Orders on La…Construction Baseline Productivity: Theory and Practice (1999)Construction Baseline Product…Quantitative Impacts of Project Change: Size Issues (1997)Quantitative Impacts of Proje…Modeling for Litigation: Mixing Qualitative and Quantitative Approaches (1997)Modeling for Litigation: Mixi…Introduction to System Dynamics Modeling with DYNAMO (1997)Introduction to System Dynami…Introduction to System Dynamics Modeling with DYNAMO (1997)Introduction to System Dynami…Quantitative Effects of Construction Changes on Labor Productivity (1995)Quantitative Effects of Const…Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Construction Claims and Dispu…Action‐Response Model and Loss of Productivity in Construction (1994)Action‐Response Model and Los…Productivity improvement in construction (1988)Productivity improvement in c…Construction Claims: Frequency and Severity (1985)Construction Claims: Frequenc…Naval Ship Production: A Claim Settled and a Framework Built (1980)Naval Ship Production: A Clai…Using ANN to Predict the Impact of Communication Factors on the Rework Cost in Construction Projects (2021)Using ANN to Predict the Impa…The antecedents of construction project change: an analysis of design and build procurement application (2021)The antecedents of constructi…A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance (2021)A Case Study of a Negotiated …System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study (2020)System dynamics modeling appr…Risk Propagation Model and Simulation of Schedule Change in Construction Projects: A Complex Network Approach (2020)Risk Propagation Model and Si…Labour productivity in Australian building construction projects: a roadmap for improvement (2020)Labour productivity in Austra…ANN-based prediction intervals to forecast labour productivity (2020)ANN-based prediction interval…Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects (2019)Impacts of Change Orders on C…Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects (2019)Change Orders and Schedule Pe…Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach (2017)Prediction and improvement of…The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance (2016)The moderating effect of proj…On-site construction productivity in Malaysian infrastructure projects (2016)On-site construction producti…Analysis of causes and impact of variation order on educational building projects (2016)Analysis of causes and impact…Analysis of Factors Affecting Design Changes in Construction Project with Partial Least Square (PLS) (2015)Analysis of Factors Affecting…Factors Affecting Engineering Productivity (2011)Factors Affecting Engineering…CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP (2010)CAUSES OF VARIATION ORDERS IN…THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY (1979)Modeling Managerial Behavior: Misperceptions of Feedback in a Dynamic Decision Making Experiment (1989)Learning Curves in Manufacturing (1990)Forensic project management: The underlying causes of rework in construction projects (2004)Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework (2008)Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project (2009)Professional Construction Management (1976)Construction Project Administration (1978)Quantitative Definition of Projects Impacted by Change Orders (2002)Statistical analysis of causes for change orders in metropolitan public works (2004)Modeling Construction Labor Productivity (1990)Labor Productivity Drivers and Opportunities in the Construction Industry (2003)Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore (2016)Factors influencing labor productivity on construction sites (2016)Factors Affecting the Cost of Airplanes (1936)Urban Dynamics (1969)The Fifth Discipline (1990)Variety is the spice of life: combining soft and hard OR/MS methods (2000)Management’s Perception of Key Performance Indicators for Construction (2003)Large construction projects in developing countries: a case study from Vietnam (2004)Role of Simulation in Construction Engineering and Management (2010)Systems thinking and organizational learning: Acting locally and thinking globally in the organization of the future (1992)Scripts for group model building (1997)Collecting and analyzing qualitative data for system dynamics: methods and models (2003)A system dynamics model for assessing the impacts of design errors in construction projects (2011)System dynamics perspectives and modeling opportunities for research in operations management (2015)Conflict and dispute in construction (1997)Conflicts, claims and disputes in construction (1997)Construction Project Cost Escalation Factors (2009)System Dynamics: Systems Thinking and Modeling for a Complex World (2002)Promoting novelty, rigor, and style in energy social science: Towards codes of practice for appropriate methods and research design (2018)Artificial Intelligence and Management: The Automation–Augmentation Paradox (2021)Multiple tests for validation of system dynamics type of simulation models (1989)Group model building effectiveness: a review of assessment studies (2002)System dynamics applied to project management: a survey, assessment, and directions for future research (2007)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 2000Business Dynamics: Systems Thinking and Modeling for a Complex World9,353 cited
  • 1997Introduction to System Dynamics Modeling with DYNAMO675 cited
  • 1988Productivity improvement in construction519 cited
  • 1997Introduction to System Dynamics Modeling with DYNAMO496 cited
  • 1994Construction Claims and Disputes: Causes and Cost/Time Overruns287 cited
  • 1980Naval Ship Production: A Claim Settled and a Framework Built256 cited
  • 1995Quantitative Effects of Construction Changes on Labor Productivity191 cited
  • 1999Impact of Change Orders on Labor Efficiency for Electrical Construction175 cited
  • 1997Modeling for Litigation: Mixing Qualitative and Quantitative Approaches165 cited
  • 2000The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects157 cited
  • 1999Construction Baseline Productivity: Theory and Practice154 cited
  • 2005Change Orders Impact on Labor Productivity146 cited
  • 1997Quantitative Impacts of Project Change: Size Issues143 cited
  • 1985Construction Claims: Frequency and Severity138 cited
  • 2003Structuring a delay and disruption claim: An application of cause-mapping and system dynamics

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

124 cited
  • 1994Action‐Response Model and Loss of Productivity in Construction117 cited
  • Cited by

    • 2015Analysis of Factors Affecting Design Changes in Construction Project with Partial Least Square (PLS)104 cited
    • 2010CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP74 cited
    • 2016On-site construction productivity in Malaysian infrastructure projects70 cited
    • 2020System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study58 cited
    • 2021The antecedents of construction project change: an analysis of design and build procurement application50 cited
    • 2016Analysis of causes and impact of variation order on educational building projects47 cited
    • 2016The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance46 cited
    • 2019Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects43 cited
    • 2017Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach38 cited
    • 2011Factors Affecting Engineering Productivity34 cited
    • 2021A Case Study of a Negotiated Tender within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance34 cited
    • 2021Using ANN to Predict the Impact of Communication Factors on the Rework Cost in Construction Projects34 cited
    • 2020ANN-based prediction intervals to forecast labour productivity33 cited
    • 2020Labour productivity in Australian building construction projects: a roadmap for improvement33 cited
    • 2020Risk Propagation Model and Simulation of Schedule Change in Construction Projects: A Complex Network Approach33 cited
    • 2019Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects27 cited