Local search techniques for the generalized resource constrained project scheduling problem
16 references·3 citing·30 second hop
Local search techniques for the generalized resource constrained project scheduling problem (1993)Local search techniques for the generaliz…Journal of Industrial Engineering (2017)Journal of Industrial Enginee…Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (1990)Computational experience with…The general employee scheduling problem. An integration of MS and AI (1986)The general employee scheduli…A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions (1986)A Comparison of Heuristics fo…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach (1976)Scheduling a Project Under Mu…Project scheduling: The effects of problem structure on heuristic performance (1976)Project scheduling: The effec…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)An Algorithm for Optimal Proj…A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A Heuristic Model for Schedul…Some Properties of Schedules for Large Projects with Limited Resources (1964)Some Properties of Schedules …Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities (2017)Metaheuristics for multi-mode…Scheduling and constraint propagation (2002)Scheduling and constraint pro…Resource-constrained multi-project management, a hierarchical decision support system (1998)Resource-constrained multi-pr…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Application of a Technique for Research and Development Program Evaluation (1959)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling (1990)Avoiding local optima in thep-hub location problem using tabu search and GRASP (1992)Survey, Categorization, and Comparison of Recent Tour Scheduling Literature (2004)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Resource-constrained project scheduling by simulated annealing (1996)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)Critical Chain Project Scheduling: Do Not Oversimplify (2002)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)The Economic Design of Control Charts: A Review and Literature Survey (1980)Treating Progress Functions as a Managerial Opportunity (1984)Revised NIOSH equation for the design and evaluation of manual lifting tasks (1993)
this work references cited by second hop

References

  • 2017Journal of Industrial Engineering1,623 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1986The general employee scheduling problem. An integration of MS and AI295 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 1964Some Properties of Schedules for Large Projects with Limited Resources166 cited
  • 1971An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints165 cited
  • 1967A Heuristic Model for Scheduling Large Projects with Limited Resources164 cited
  • 1976Project scheduling: The effects of problem structure on heuristic performance142 cited
  • 1986A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

135 cited
  • 1990Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems128 cited
  • 1976Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach88 cited
  • Cited by

    • 2002Scheduling and constraint propagation63 cited
    • 1998Resource-constrained multi-project management, a hierarchical decision support system52 cited
    • 2017Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities41 cited