SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Regional Comparison of Temporary Housing Construction Processes After the 2011 Great East Japan Earthquake and Tsunami
2 references·0 citing·6 second hop
Regional Comparison of Temporary Housing Construction Processes After the 2011 Great East Japan Earthquake and Tsunami (2014)Regional Comparison of Temporary Housing …RECOVERY CURVES FOR HOUSING RECONSTRUCTION IN SRI LANKA AFTER THE 2004 INDIAN OCEAN TSUNAMI (2010)RECOVERY CURVES FOR HOUSING R…Reconstruction following disaster (1977)Reconstruction following disa…Post-Disaster Urban Recovery Monitoring in Pisco After the 2007 Peru Earthquake Using Satellite Image (2014)A Decade After the 2004 Indian Ocean Tsunami: The Progress in Disaster Preparedness and Future Challenges in Indonesia, Sri Lanka, Thailand and the Maldives (2015)Quantifying COVID-19 recovery process from a human mobility perspective: An intra-city study in Wuhan (2022)Post-traumatic Stress Reactions in Children After the 1988 Armenian Earthquake (1993)Sustainability and community resilience: the holy grail of hazards planning? (1999)Reducing Disaster Risk: a challenge for development (2004)
this work references cited by second hop

References

  • 1977Reconstruction following disaster369 cited
  • 2010RECOVERY CURVES FOR HOUSING RECONSTRUCTION IN SRI LANKA AFTER THE 2004 INDIAN OCEAN TSUNAMI27 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work