SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Dynamic Programming for Project Cost-Time Curves
0 references·3 citing·11 second hop
Dynamic Programming for Project Cost-Time Curves (1967)Dynamic Programming for Project Cost-Time…New fuzzy models for time-cost trade-off problem (2010)New fuzzy models for time-cos…Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability (2005)Chance-Constrained Time–Cost …A CPM Time-Cost Computational Algorithm for Arbitrary Activity Cost Functions (1977)A CPM Time-Cost Computational…A Network Flow Computation for Project Cost Curves (1961)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Simple CPM Time-Cost Tradeoff Algorithm (1971)Nature-inspired metaheuristics for multiobjective activity crashing (2006)Chance-Constrained Programming (1959)Fuzzy sets (1965)Fuzzy sets (1996)Probability, statistics, and decision for civil engineers (1970)Stochastic Programming (1995)Utility-based decision support system for schedule optimization (2007)A new approach to solve time–cost trade-off problem with fuzzy decision variables (2008)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1977A CPM Time-Cost Computational Algorithm for Arbitrary Activity Cost Functions39 cited
  • 2005Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability34 cited
  • 2010New fuzzy models for time-cost trade-off problem27 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work