Early-Termination Compensation in Public–Private Partnership Projects
16 references·1 citing·51 second hop
Early-Termination Compensation in Public–Private Partnership Projects (2015)Early-Termination Compensation in Public–…Concession Renegotiation Models for Projects Developed through Public-Private Partnerships (2014)Concession Renegotiation Mode…System Dynamics (SD) -based concession pricing model for PPP highway projects (2011)System Dynamics (SD) -based c…Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options (2011)Risk-Neutral Pricing Approach…Time Series Analysis of ENR Construction Cost Index (2010)Time Series Analysis of ENR C…Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties (2007)Using extended Monte Carlo si…Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract (2007)Using Bargaining-Game Theory …A simulation model for optimizing the concession period of public–private partnerships schemes (2007)A simulation model for optimi…Socio-economically sustainable civil engineering infrastructures by optimization (2005)Socio-economically sustainabl…RETRACTED: Inaccuracy in Traffic Forecasts (2005)RETRACTED: Inaccuracy in Traf…Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects (2005)Financial Viability Analysis …What Causes Cost Overrun in Transport Infrastructure Projects? (2004)What Causes Cost Overrun in T…Public and private sector discount rates in public–private partnerships (2003)Public and private sector dis…The demand elasticity on tolled motorways (2002)The demand elasticity on toll…Efficient Monte Carlo simulation method of GERT-type network for project management (2002)Efficient Monte Carlo simulat…An option pricing-based model for evaluating the financial viability of privatized infrastructure projects (2002)An option pricing-based model…Probability Concepts in Engineering Planning and Design (1975)Probability Concepts in Engin…Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory (2017)Pricing Mechanism of Early Te…The Pricing of Options and Corporate Liabilities (1973)Investment under Uncertainty (1994)Investment Under Uncertainty. (1994)A Structural Equation Model of Feasibility Evaluation and Project Success for Public–Private Partnerships in Hong Kong (2010)Collar options to manage revenue risks in real toll public‐private partnership transportation projects (2010)Revenue guarantee in public-private partnerships: a fair risk allocation model (2014)Time Series Analysis Forecasting and Control. (1971)Time Series Analysis: Forecasting and Control (1977)Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model (2011)Estimation and prediction of construction cost index using neural networks, time series, and regression (2019)Neural network-based interval forecasting of construction material prices (2021)Risk analysis capital investment (1964)Public Private Partnerships: Managing Risks and Opportunities (2003)Risk Analysis in Project Management (2003)Enabling Development of the Transportation Public-Private Partnership Market in the United States (2009)Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects (2011)Risk perceptions and approaches in multi-organizations: A research review 2000–2012 (2013)“Options, Futures, and Other Derivatives” (2016)Financial risk assessment and modelling of PPP based Indian highway infrastructure projects (2017)The front-end of projects: a systematic literature review and structuring (2019)Equilibrium points in n -person games (1950)The Bargaining Problem (1950)Non-Cooperative Games (1951)Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach (2021)Management Guide to PERT/CPM (1969)Project Financing: Asset-Based Financial Engineering (1996)Simulation with Arena (1998)Win–Win Concession Period Determination Methodology (2009)Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects (2012)Conceptual Framework for the Performance Measurement of Public-Private Partnerships (2014)Prospect Theory: An Analysis of Decision under Risk (1979)Prospect theory: An analysis of decision under risk (1988)Heuristics and Biases: The Psychology of Intuitive Judgment (2004)Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects (2010)Infrastructure Procurement: Learning from Private–Public Partnership Experiences ‘Down Under’ (2011)Allocating Revenue Risk in Transport Infrastructure Public Private Partnership Projects: How it Matters (2014)Aggregation and Linearity in the Provision of Intertemporal Incentives (1987)The theory of contracts (1987)The Proper Scope of Government: Theory and an Application to Prisons (1997)Time Discounting and of the Cost of Capital in Government (2004)Valuing the future: the social discount rate in cost benefit analysis (2010)Accounting‐related research in PPPs/PFIs: present contributions and future opportunities (2012)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Megaprojects and Risk (2003)From Nobel Prize to Project Management: Getting Risks Right (2006)Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice (2007)Some stylized facts about high-speed rail: A review of HSR experiences around the world (2009)Structural Reliability Methods (1996)Error and uncertainty in modeling and simulation (2002)Measuring vulnerability to natural hazards: towards disaster resilient societies (2007)
this work references cited by second hop

References

  • 1975Probability Concepts in Engineering Planning and Design2,575 cited
  • 2004What Causes Cost Overrun in Transport Infrastructure Projects?649 cited
  • 2005RETRACTED: Inaccuracy in Traffic Forecasts218 cited
  • 2011Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options176 cited
  • 2005Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects172 cited
  • 2007Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract158 cited
  • 2002An option pricing-based model for evaluating the financial viability of privatized infrastructure projects157 cited
  • 2010Time Series Analysis of ENR Construction Cost Index152 cited
  • 2003Public and private sector discount rates in public–private partnerships133 cited
  • 2007A simulation model for optimizing the concession period of public–private partnerships schemes127 cited
  • 2005Socio-economically sustainable civil engineering infrastructures by optimization121 cited
  • 2011System Dynamics (SD) -based concession pricing model for PPP highway projects106 cited
  • 2007Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties103 cited
  • 2002Efficient Monte Carlo simulation method of GERT-type network for project management

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

69 cited
  • 2002The demand elasticity on tolled motorways68 cited
  • 2014Concession Renegotiation Models for Projects Developed through Public-Private Partnerships66 cited
  • Cited by

    • 2017Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory38 cited