Takt Time Planning for Construction of Exterior Cladding
2 references·8 citing·39 second hop
Takt Time Planning for Construction of Exterior Cladding (2013)Takt Time Planning for Construction of Ex…The Toyota Way Fieldbook: A Practical Guide for Implementing Toyota's 4Ps (2005)The Toyota Way Fieldbook: A P…Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Parade Game: Impact of Work F…Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning (2023)Adaptive control of resource …Mapping the supply chain: Why, what and how? (2022)Mapping the supply chain: Why…Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East (2017)Coordination Challenges of Pr…What constitutes good production flow in construction? (2016)What constitutes good product…Takt-Time Planning and the Last Planner (2014)Takt-Time Planning and the La…Development of a Takt-time Plan: A Case Study (2014)Development of a Takt-time Pl…An Experiment in Takt Time Planning Applied to Non-Repetitive Work (2013)An Experiment in Takt Time Pl…Lean Thinking-Banish Waste and Create Wealth in Your Corporation. (1997)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Shielding Production: Essential Step in Production Control (1998)Reducing Variability to Improve Performance as a Lean Construction Principle (2002)Work Flow Variation and Labor Productivity: Case Study (2010)A cross-sector review on the use of value stream mapping (2017)Line‐of‐Balance Scheduling in Pavement Construction (1986)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)The Integrated Agreement for Lean Project Delivery (2010)Toyota production system: beyond large-scale production (1998)The Toyota way : 14 management principles from the world's greatest manufacturer (2004)Production Control Principles (2009)An exploration towards a production theory and its application to construction (2000)Value creation dynamics in a project alliance (2019)Improving green performance of construction projects through supply chain integration: The role of environmental knowledge (2021)Comparative analysis of the country case studies (2023)What you Should Know about Megaprojects and Why: An Overview (2014)Assessment of systematic risk management practices on building construction projects in Ghana (2020)Clarifying megaproject complexity in developing countries: A literature review and conceptual study (2021)Qualitative evaluation and research methods (1990)Survey research in operations management: a process‐based perspective (2002)A guide to the project management body of knowledge (PMBOK guide) (2004)Utilizing Large Language Models to Illustrate Constraints for Construction Planning (2024)Integrating the Supply Chain (1989)Supply Chain Management: Implementation Issues and Research Opportunities (1998)A digital supply chain twin for managing the disruption risks and resilience in the era of Industry 4.0 (2020)A network-of-networks adaptation for cross-industry manufacturing repurposing (2023)Digital supply chain surveillance using artificial intelligence: definitions, opportunities and risks (2023)Supply chain digitalization, green technology innovation and corporate energy efficiency (2024)Management of production in construction: A theoretical view (1999)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Causes of delays on construction projects: a comprehensive list (2019)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)Out of the Crisis (1982)Lean project management (2003)The Toyota Production System and art: making highly customized and creative products the Toyota way (2007)Exploring barriers in lean implementation (2014)The impact of using different lean manufacturing tools on waste reduction (2020)
this work references cited by second hop

References

  • 2005The Toyota Way Fieldbook: A Practical Guide for Implementing Toyota's 4Ps363 cited
  • 1999Parade Game: Impact of Work Flow Variability on Trade Performance317 cited

Cited by

  • 2022Mapping the supply chain: Why, what and how?114 cited
  • 2016What constitutes good production flow in construction?100 cited
  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2023Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning54 cited
  • 2014Development of a Takt-time Plan: A Case Study49 cited
  • 2013An Experiment in Takt Time Planning Applied to Non-Repetitive Work45 cited
  • 2014Takt-Time Planning and the Last Planner43 cited
  • 2017Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East38 cited