SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The Evolution of Software Quality in Project Scheduling
16 references·1 citing·29 second hop
The Evolution of Software Quality in Project Scheduling (1999)The Evolution of Software Quality in Proj…Journal of Industrial Engineering (2017)Journal of Industrial Enginee…Project Management, Planning and Control (2014)Project Management, Planning …A Classification Scheme for Project Scheduling (1999)A Classification Scheme for P…Adaptive search for solving hard project scheduling problems (1996)Adaptive search for solving h…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)Resource-constrained multi-pr…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Some efficient multi-heuristi…Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling (1989)Heuristic Performance and Net…HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESO…Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis (1988)Evaluating Project Scheduling…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…Multi-Project Scheduling: Analysis of Project Performance (1985)Multi-Project Scheduling: Ana…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks (2010)A hybrid scatter search appro…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A survey on the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Activity networks: Project planning and control by network models (1977)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Statistical principles in experimental design. (1962)Resource-constrained project scheduling by simulated annealing (1996)A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource-constrained project scheduling: A survey of recent developments (1998)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)Critical-path planning and scheduling (1959)A genetic algorithm approach to a general category project scheduling problem (1999)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)The Economic Design of Control Charts: A Review and Literature Survey (1980)Treating Progress Functions as a Managerial Opportunity (1984)Revised NIOSH equation for the design and evaluation of manual lifting tasks (1993)
this work references cited by second hop

References

  • 2017Journal of Industrial Engineering1,623 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1990Some efficient multi-heuristic procedures for resource-constrained project scheduling261 cited
  • 1999A Classification Scheme for Project Scheduling195 cited
  • 1989HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS195 cited
  • 1976Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation174 cited
  • 1985Multi-Project Scheduling: Analysis of Project Performance141 cited
  • 1996Adaptive search for solving hard project scheduling problems133 cited
  • 1993Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics126 cited
  • 2014Project Management, Planning and Control112 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1988Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis97 cited
  • 1989Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling90 cited
  • Cited by

    • 2010A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks28 cited