No open-access location is known for this record yet.
No open-access location is known for this record yet.
Post-disaster reconstruction poses resourcing challenges specific to the construction practitioners and requires constant improvements of the construction industry and of the environment in which it operates. By drawing on in-field surveys and observations in the disaster affected areas in Indonesia, China and Australia, the research examines their respective resourcing practice following a disaster with a particular focus on identifying the resource and capacity constraints that confronted the reconstruction practitioners in a post-disaster situation. This mapping exercise helps draw attention from decision makers and the construction sector to the vulnerable areas in post-disaster reconstruction and also generates lessons and experiences worthy of adoption in other disaster situations. Practical measures are suggested to improve the implementation of physical reconstruction through laws, regulations and policies, along with the according mechanisms in the industry and at a project level.
Loading…
Stored only when both papers are in the corpus — 7 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.