SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Computer based ex-ante evaluation of the planned railway line between Copenhagen and Ringsted by use of a Decision Support System named COSIMA-DSS
3 references·1 citing·10 second hop
Computer based ex-ante evaluation of the planned railway line between Copenhagen and Ringsted by use of a Decision Support System named COSIMA-DSS (2006)Computer based ex-ante evaluation of the …Decision analysis for management judgment (2005)Decision analysis for managem…Multi-Criteria Decision Analysis via Ratio and Difference Judgement (1999)Multi-Criteria Decision Analy…Road infrastructure planning: A decision-oriented approach (1996)Road infrastructure planning:…Light rail project in Copenhagen – the Ring 21⁄2 corridor (2020)Light rail project in Copenha…Examination of catchment areas for public transport (2020)Multi Criteria Analysis for bioenergy systems assessments (2008)A modified TOPSIS with a different ranking index (2016)Public acceptance and preferences related to renewable energy and grid expansion policy: Empirical insights for Germany (2016)On the Use of Weighted Linear Combination Method in GIS: Common and Best Practice Approaches (2000)Expert Opinions in Forecasting: The Role of the Delphi Technique (2001)Risks and decisions for conservation and environmental management (2005)Modelling decision support and uncertainty for large transport infrastructure projects: The CLG-DSS model of the Øresund Fixed Link (2006)Assessment of large transport infrastructure projects: The CBA-DK model (2009)Transport appraisal and Monte Carlo simulation by use of the CBA-DK model (2010)
this work references cited by second hop

References

  • 2005Decision analysis for management judgment794 cited
  • 1999Multi-Criteria Decision Analysis via Ratio and Difference Judgement271 cited
  • 1996Road infrastructure planning: A decision-oriented approach25 cited

Cited by

  • 2020Light rail project in Copenhagen – the Ring 21⁄2 corridor6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work