SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
THE DECISION PROCESS IN SET-BASED CONCURRENT ENGINEERING - AN INDUSTRIAL CASE STUDY
0 references·3 citing·8 second hop
THE DECISION PROCESS IN SET-BASED CONCURRENT ENGINEERING - AN INDUSTRIAL CASE STUDY (2010)THE DECISION PROCESS IN SET-BASED CONCURR…KERANGKA KERJA PERENCANAAN PENGEMBANGAN PRODUK SEBAGAI PENINGKATAN DAYA SAING INDUSTRI KECIL MENENGAH (2019)KERANGKA KERJA PERENCANAAN PE…A Reactive Agent-Based Decision-Making System for SBCE (2016)A Reactive Agent-Based Decisi…Combining set-based concurrent engineering and function — Means modelling to manage platform-based product family design (2014)Combining set-based concurren…The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster (1995)The second Toyota paradox: How delaying decisions can make better cars faster (1995)Toyota's Principles of Set-Based Concurrent Engineering (1999)Agent-based computing from multi-agent systems to agent-based models: a visual survey (2011)The Dimensions of Industrial New Product Success and Failure (1979)Toward a General Modular Systems Theory and Its Application to Interfirm Product Modularity (2000)Why Some New Products are More Successful than Others (2001)Mapping challenges in developing sustainable small and medium industries: Integrating Lean and green principles (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2019KERANGKA KERJA PERENCANAAN PENGEMBANGAN PRODUK SEBAGAI PENINGKATAN DAYA SAING INDUSTRI KECIL MENENGAH6 cited
  • 2014Combining set-based concurrent engineering and function — Means modelling to manage platform-based product family design5 cited
  • 2016A Reactive Agent-Based Decision-Making System for SBCE5 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work