SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Research Notes. THE HARMONOGRAM OF KAROL ADAMIECKI.
0 references·6 citing·24 second hop
Research Notes. THE HARMONOGRAM OF KAROL ADAMIECKI. (1975)Research Notes. THE HARMONOGRAM OF KAROL …Modeling 4.0: Conceptual Modeling in a Digital Era (2023)Modeling 4.0: Conceptual Mode…Harmonizing construction processes in repetitive construction projects with multiple buildings (2022)Harmonizing construction proc…The meeting as subjunctive form: public/private IT projects in British and Turkish state bureaucracies (2017)The meeting as subjunctive fo…Human Resource Management in Russia (2016)Human Resource Management in …Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Construction Engineering—Reinvigorating the Discipline (2010)Construction Engineering—Rein…Real World Research: A Resource for Social Scientists and Practitioner-Researchers (1993)Qualitative metasynthesis: Issues and techniques (1997)Five Misunderstandings About Case-Study Research (2004)Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Enhanced Repetitive-Scheduling Computation and Visualization (2020)New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects (2020)The Management of Projects (1994)Managing the Unexpected (2011)SOCIAL NETWORK ANALYSIS OF INFORMATION FLOW IN AN IPD-PROJECT DESIGN ORGANIZATION (2013)The Many Futures of Contracts (2013)Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East (2017)Framework for Managing Integration Challenges of Last Planner System in IMPs (2018)Laboratory Life: The Construction of Scientific Facts (1986)A PUBLIC MANAGEMENT FOR ALL SEASONS? (1991)Selections from the Prison Notebooks (2007)Time and Relational Possibility: Cultural Anthropology in 2017 (2018)What was the project? Thoughts on genre and the project form (2022)Interactive analysis of multiple-criteria project scheduling problems (1998)Deriving priorities from fuzzy pairwise comparison judgements (2003)Group prioritization in the AHP by fuzzy preference programming method (2003)Customized particle swarm optimization for harmonizing multi-section construction projects (2024)Research Commentary: Information Systems and Conceptual Modeling—A Research Agenda (2002)Robust Design: An Overview (2006)The mass customization decade: An updated review of the literature (2012)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
  • 2010Construction Engineering—Reinvigorating the Discipline44 cited
  • 2017The meeting as subjunctive form: public/private IT projects in British and Turkish state bureaucracies32 cited
  • 2022Harmonizing construction processes in repetitive construction projects with multiple buildings30 cited
  • 2016Human Resource Management in Russia16 cited
  • 2023Modeling 4.0: Conceptual Modeling in a Digital Era8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work