Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
13 references·0 citing·35 second hop
Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (2016)Resource levelling in project scheduling …Handbook on project management and scheduling (2015)Handbook on project managemen…Handbook on Project Management and Scheduling Vol.1 (2015)Handbook on Project Managemen…Mixed-integer linear programming for resource leveling problems (2012)Mixed-integer linear programm…An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (2011)An exact algorithm to minimiz…Exact methods for the resource levelling problem (2010)Exact methods for the resourc…A priority-rule method for project scheduling with work-content constraints (2009)A priority-rule method for pr…A branch-and-cut algorithm for scheduling of projects with variable-intensity activities (2005)A branch-and-cut algorithm fo…Project Scheduling with Time Windows and Scarce Resources (2003)Project Scheduling with Time …The resource renting problem subject to temporal constraints (2001)The resource renting problem …Benchmark Instances for Project Scheduling Problems (1999)Benchmark Instances for Proje…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Construction performance control by networks (1976)Construction performance cont…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A linear programming and constraint propagation-based lower bound for the RCPSP (2000)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Project Scheduling: A Research Handbook (2002)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)A genetic algorithm for the robust resource leveling problem (2015)Tactical capacity planning in a real-world ETO industry case: An action research (2015)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (2017)A survey in the resource-constrained project and multi-project scheduling problems (2020)Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem (2020)Activity networks: Project planning and control by network models (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A Constraint-Based Method for Project Scheduling with Time Windows (2002)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project Scheduling—Theory and Practice (2005)Skilled workforce scheduling in Service Centres (2007)A project scheduling approach to production planning with feeding precedence relations (2010)Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (2015)Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting (2017)Extensions of the resource-constrained project scheduling problem (2023)Consolidated optimization algorithm for resource-constrained project scheduling problems (2017)A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem (2018)A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2021)Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)Applying Modified Minimum Moment Method to Multiple Resource Leveling (2001)
this work references cited by second hop

References

  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 2003Project Scheduling with Time Windows and Scarce Resources305 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 1999Benchmark Instances for Project Scheduling Problems132 cited
  • 2012Mixed-integer linear programming for resource leveling problems117 cited
  • 2005A branch-and-cut algorithm for scheduling of projects with variable-intensity activities117 cited
  • 2015Handbook on Project Management and Scheduling Vol.1103 cited
  • 1976Construction performance control by networks94 cited
  • 2015Handbook on project management and scheduling85 cited
  • 2009A priority-rule method for project scheduling with work-content constraints73 cited
  • 2001The resource renting problem subject to temporal constraints59 cited
  • 2011An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations46 cited
  • 2010Exact methods for the resource levelling problem42 cited

Cited by

No citing works inside the corpus for this window.