SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Late disputes and the NEC3 Engineering and Construction Contract
2 references·0 citing·4 second hop
Late disputes and the NEC3 Engineering and Construction Contract (2016)Late disputes and the NEC3 Engineering an…The NEC 3 Engineering and Construction Contract (2006)The NEC 3 Engineering and Con…Disputing the existence of a dispute as a strategy for avoiding construction adjudication (2006)Disputing the existence of a …Legal Research: How to Find and Understand the Law (2012)Decision Support System for Analyzing Key Performance Indicators in Construction Projects Management (2022)Teaching Construction Contracts: Mutual Learning Experience (2009)Modifications to standard forms of contract: the impact on readability (2014)
this work references cited by second hop

References

  • 2006The NEC 3 Engineering and Construction Contract39 cited
  • 2006Disputing the existence of a dispute as a strategy for avoiding construction adjudication26 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work