CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH
5 references·1 citing·23 second hop
CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH (2009)CONCURRENT PROJECT SCHEDULING AND MATERIA…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…Integrated project scheduling and material planning with variable activity duration and rewards (2001)Integrated project scheduling…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Optimal Project Scheduling with Materials Ordering (1987)Optimal Project Scheduling wi…Constrained resource project scheduling subject to material constraints (1984)Constrained resource project …Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers (2015)Simultaneous planning of the …Management Guide to PERT/CPM (1969)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)The development of cash flow weight procedures for maximizing the net present value of a project (1996)Integrated scheduling and batch ordering for construction project (2013)Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies (2016)Dynamic Version of the Economic Lot Size Model (1958)Production and inventory management (1983)A hybrid project scheduling and material ordering problem: Modeling and solution algorithms (2017)Integrated planning of project scheduling and material procurement considering the environmental impacts (2018)A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty (2021)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Design and Analysis of Experiments (2000)Design and Analysis of Experiments, 5th Ed. (2001)A robust bi-objective model for concurrent planning of project scheduling and material procurement (2016)Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm (2021)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)
this work references cited by second hop

References

  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 2001Integrated project scheduling and material planning with variable activity duration and rewards75 cited
  • 1984Constrained resource project scheduling subject to material constraints67 cited
  • 1987Optimal Project Scheduling with Materials Ordering53 cited

Cited by

  • 2015Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers35 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work