SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
DSM Versus CPM: Issues for Planning Design & Construction Activities
7 references·0 citing·29 second hop
DSM Versus CPM: Issues for Planning Design & Construction Activities (2003)DSM Versus CPM: Issues for Planning Desig…Planning and managing the design of systems (2002)Planning and managing the des…Application of the Analytical Design Planning Technique to Construction Project Management (2000)Application of the Analytical…Customer-oriented Design Methods for Construction Projects (1998)Customer-oriented Design Meth…A Data Flow Model to Plan and Manage the Building Design Process (1996)A Data Flow Model to Plan and…Subjective and interactive duration estimation (1993)Subjective and interactive du…Organizing the Tasks in Complex Design Projects (1990)Organizing the Tasks in Compl…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Managing the integration problem in concurrent engineering (1993)A model-based method for organizing tasks in product development (1994)Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process (2000)Quality Function Deployment : Integrating Customer Requirements into Product Design (1990)Concurrent engineering: Automation, tools, and techniques (1994)Total Quality Development (1998)Establishing and processing client requirements-a key aspect of concurrent engineering in construction (2000)A QFD-enabled product conceptualisation approach via design knowledge hierarchy and RCE neural network (2005)Automated Requirements Identification from Construction Contract Documents Using Natural Language Processing (2020)Journal of Construction Engineering and Management (1983)Model-based Approaches to Managing Concurrent Engineering (1991)Soft Systems Methodology in Action (1991)Modelling and managing project complexity (2002)Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects (2018)A knowledge-based tool for multilevel decomposition of a complex design problem (1989)A Framework for Design Process Specifications Management (1999)A Constraint-driven Execution Plan for Maximizing Concurrency in Product Development (2003)4.3.2 Platform identification using Design Structure Matrices (2006)Structured Systems Analysis (2020)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)Assessment of productivity and duration of highway construction activities subject to impact of rain (2004)A Fuzzy Discrete Event Simulation Framework for Construction Applications: Improving the Simulation Time Advancement (2016)Overview of construction simulation approaches to model construction processes (2019)Efficient organizing of design activities (1993)Design for Variety: A Methodology for Developing Product Platform Architectures (2000)Knowledge Sharing in Information Systems Development: A Social Interdependence Perspective (2010)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1990Organizing the Tasks in Complex Design Projects140 cited
  • 1996A Data Flow Model to Plan and Manage the Building Design Process77 cited
  • 1998Customer-oriented Design Methods for Construction Projects53 cited
  • 2002Planning and managing the design of systems46 cited
  • 1993Subjective and interactive duration estimation40 cited
  • 2000Application of the Analytical Design Planning Technique to Construction Project Management38 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work