A lexicographic approach to the robust resource‐constrained project scheduling problem
16 references·1 citing·28 second hopsampled
A lexicographic approach to the robust resource‐constrained project scheduling problem (2016)A lexicographic approach to the robust re…Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Solving stochastic resource-c…A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem (2014)A particle swarm optimization…Mixed-integer linear programming for resource leveling problems (2012)Mixed-integer linear programm…Proactive policies for the stochastic resource-constrained project scheduling problem (2011)Proactive policies for the st…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling (2007)A two-stage-priority-rule-bas…Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Simulated annealing and tabu …Project scheduling under uncertainty: Survey and research potentials (2004)Project scheduling under unce…A bi-objective model for robust resource-constrained project scheduling (2004)A bi-objective model for robu…An integrated survey of deterministic project scheduling (2001)An integrated survey of deter…A Robust Genetic Algorithm for Resource Allocation in Project Scheduling (2001)A Robust Genetic Algorithm fo…A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A Competitive Heuristic Solut…Using metaheuristics in multiobjective resource constrained project scheduling (2000)Using metaheuristics in multi…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An updated survey of variants…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Ant colony optimization for resource-constrained project scheduling (2002)A state of the art review of intelligent scheduling (2018)A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2019)Some Properties of Schedules for Large Projects with Limited Resources (1964)A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A ZERO-ONE PROGRAMMING APPROACH TO SCHEDULING WITH LIMITED RESOURCES, (1968)Operations Research-Verfahren (1963)Activity networks: Project planning and control by network models (1977)An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)Resource-constrained project scheduling: A survey of recent developments (1998)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Project Scheduling: A Research Handbook (2002)Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (2007)Robust Discrete Optimization and Its Applications (1997)Robust Discrete Optimization and Its Applications. (1998)Robust and reactive project scheduling: a review and classification of procedures (2004)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (2022)Resource-constrained multi-project scheduling problem: A survey (2022)Extensions of the resource-constrained project scheduling problem (2023)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2004Project scheduling under uncertainty: Survey and research potentials995 cited
  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem904 cited
  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 2001An integrated survey of deterministic project scheduling519 cited
  • 1988Scheduling project networks with resource constraints and time windows376 cited
  • 2001A Robust Genetic Algorithm for Resource Allocation in Project Scheduling275 cited
  • 2004A bi-objective model for robust resource-constrained project scheduling249 cited
  • 2014A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem181 cited
  • 2004Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models174 cited
  • 2001A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling168 cited
  • 2007A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling153 cited
  • 2000Using metaheuristics in multiobjective resource constrained project scheduling129 cited
  • 2011Proactive policies for the stochastic resource-constrained project scheduling problem

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

122 cited
  • 2015Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming118 cited
  • 2012Mixed-integer linear programming for resource leveling problems117 cited
  • Cited by

    • 2021An updated survey of variants and extensions of the resource-constrained project scheduling problem367 cited