No open-access location is known for this record yet.
No open-access location is known for this record yet.
A new control chart is proposed by using the belief statistic for the exponential distribution. The structure of the proposed control chart is given to measure the average run length for the shifted process. The comparison of the proposed chart is given with the existing charts in terms of the average run lengths, which shows the outperformance of the proposed chart. The performance of the proposed control chart is also discussed with the help of simulated data.
Loading…
Stored only when both papers are in the corpus — 6 citations exist upstream.
Imported from OpenAlex (CC0) — nothing here is generated.