SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Note on “replenishment run time problem with machine breakdown and failure in rework”
11 references·0 citing·41 second hop
Note on “replenishment run time problem with machine breakdown and failure in rework” (2012)Note on “replenishment run time problem w…Replenishment run time problem with machine breakdown and failure in rework (2011)Replenishment run time proble…Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown (2011)Mathematical modeling for sol…An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain (2011)An EPQ-based inventory model …Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework (2011)Alternative approach for solv…Optimum profit model based on order quantity, product price, and process quality level (2010)Optimum profit model based on…An integrated approach for logistic and vendor managed inventory in supply chain (2009)An integrated approach for lo…Introduction to Operations Research (2000)Introduction to Operations Re…A dynamic lot sizing model with exponential machine breakdowns (1997)A dynamic lot sizing model wi…Production Lot Sizing with Machine Breakdowns (1992)Production Lot Sizing with Ma…Economic Production Cycles with Imperfect Production Processes (1986)Economic Production Cycles wi…Introduction to Operations Research (1968)Introduction to Operations Re…Production and Operations Analysis (1992)Inventory management and production planning and scheduling (1999)Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown (2013)Green logistics under imperfect production system: A Rough age based Multi-Objective Genetic Algorithm approach (2018)Mathematical modelling for determining the replenishment policy for deteriorating items in an EPQ model with multiple shipments (2018)Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction (1986)The EOQ repair and waste disposal model with variable setup numbers (1996)The extended EOQ repair and waste disposal model (1996)Dynamic Version of the Economic Lot Size Model (2004)OR/MS models for supply chain disruptions: a review (2015)Introduction to Operations Research (1968)Optimizing integrated manufacturing and products inspection policy for deteriorating manufacturing system with imperfect inspection (2014)A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (2017)Economic Order Quantity under Conditions of Permissible Delay in Payments (1985)Ordering Policies of Deteriorating Items Under Permissible Delay in Payments (1995)An ordering policy for deteriorating items with allowable shortage and permissible delay in payment (1997)An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit (2014)Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand and two storage facilities (2016)State-of-the-art literature review on inventory models for perishable products (2018)How Many Parts to Make at Once (1990)Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments (2012)An integrated production inventory model of deteriorating items subject to random machine breakdown with a stochastic repair time (2016)The effects of contractual agreements on the economic production quantity model with machine breakdown (2018)Dynamic Version of the Economic Lot Size Model (1958)Incorporating multi-delivery policy and quality assurance into economic production lot size problem (2009)Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown (2009)Production and inventory management (1983)Communication and Uncertainty in Concurrent Engineering (1998)Economic production quantity model for items with imperfect quality (2000)Using multi-objective genetic algorithm for partner selection in green supply chain problems (2010)Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems (2000)The effect of vendor managed inventory (VMI) dynamics on the Bullwhip Effect in supply chains (2003)Supply chain integration in vendor-managed inventory (2005)An optimal integrated lot sizing policy of inventory in a bi-objective multi-level supply chain with stochastic constraints and imperfect products (2017)Modeling and optimization of four-level integrated supply chain with the aim of determining the optimum stockpile and period length: sequential quadratic programming (2017)The Distribution Free Newsboy Problem: Review and Extensions (1993)The total cost of logistics in supplier selection, under conditions of multiple sourcing, multiple criteria and capacity constraint (2001)A network flow model for lane-based evacuation routing (2003)Modeling customer relationships as Markov chains (2000)An insurance risk management framework for disaster relief and supply chain disruption inventory planning (2007)Automated Marketing Research Using Online Customer Reviews (2011)
this work references cited by second hop

References

  • 1968Introduction to Operations Research3,432 cited
  • 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
  • 2000Introduction to Operations Research481 cited
  • 1992Production Lot Sizing with Machine Breakdowns271 cited
  • 2011An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain141 cited
  • 2009An integrated approach for logistic and vendor managed inventory in supply chain58 cited
  • 2011Replenishment run time problem with machine breakdown and failure in rework45 cited
  • 1997A dynamic lot sizing model with exponential machine breakdowns41 cited
  • 2011Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework38 cited
  • 2011Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown25 cited
  • 2010Optimum profit model based on order quantity, product price, and process quality level13 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work