SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE
16 references·0 citing·23 second hop
THE ESTIMATION OF SOME NETWORK PARAMETERS IN THE PERT MODEL OF ACTIVITY NETWORKS: REVIEW AND CRITIQUE (1989)THE ESTIMATION OF SOME NETWORK PARAMETERS…Bounding the Project Completion Time Distribution in PERT Networks (1985)Bounding the Project Completi…The use of cutsets in Monte Carlo analysis of stochastic networks (1979)The use of cutsets in Monte C…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis (1971)Conditional Monte Carlo: A Si…Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding Distributions for a …On the Expected Duration of PERT Type Networks (1967)On the Expected Duration of P…A Statistical Theory for PERT Critical Path Analysis (1966)A Statistical Theory for PERT…Optimal Policy in a Dynamic, Single Product, Nonstationary Inventory Model with Several Demand Classes (1965)Optimal Policy in a Dynamic, …Distribution of the Time Through a Directed, Acyclic Network (1965)Distribution of the Time Thro…Critical Path Analyses Via Chance Constrained and Stochastic Programming (1964)Critical Path Analyses Via Ch…MONTE CARLO METHODS AND THE PERT PROBLEM (1963)MONTE CARLO METHODS AND THE P…Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Letter to the Editor—Monte Ca…Expected Critical Path Lengths in PERT Networks (1962)Expected Critical Path Length…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Sc…Critical-path planning and scheduling (1959)Critical-path planning and sc…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…Dynamic Inventory Policy with Varying Stochastic Demands (1960)Analysis of Inventory Systems. (1964)Optimal Policy for a Multi-Product, Dynamic, Nonstationary Inventory Problem (1965)A Threshold Inventory Rationing Policy for Service-Differentiated Demand Classes (2003)Lost-sales inventory theory: A review (2011)Making Better Fulfillment Decisions on the Fly in an Online Retail Environment (2014)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Markov and Markov-Regenerative pert Networks (1986)Six decades of project management research: Thematic trends and future opportunities (2016)An Analytical Study of the PERT Assumptions (1964)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)Sample-path optimization of convex stochastic performance functions (1996)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Time, cost and quality trade-off in project management: a case study (1999)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Stability and resource allocation in project planning (2004)Computational complexity of PERT problems (1988)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic resource-constrained project scheduling (2001)A Simple CPM Time-Cost Tradeoff Algorithm (1971)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1959Critical-path planning and scheduling623 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1959Critical-Path Planning and Scheduling283 cited
  • 1965Optimal Policy in a Dynamic, Single Product, Nonstationary Inventory Model with Several Demand Classes268 cited
  • 1963Letter to the Editor—Monte Carlo Methods and the PERT Problem268 cited
  • 1963MONTE CARLO METHODS AND THE PERT PROBLEM240 cited
  • 1965Distribution of the Time Through a Directed, Acyclic Network221 cited
  • 1962Expected Critical Path Lengths in PERT Networks188 cited
  • 1985Bounding the Project Completion Time Distribution in PERT Networks179 cited
  • 1971Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis153 cited
  • 1971Bounding Distributions for a Stochastic Acyclic Network132 cited
  • 1964Critical Path Analyses Via Chance Constrained and Stochastic Programming117 cited
  • 1967On the Expected Duration of PERT Type Networks100 cited
  • 1979The use of cutsets in Monte Carlo analysis of stochastic networks95 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1966A Statistical Theory for PERT Critical Path Analysis92 cited
  • Cited by

    No citing works inside the corpus for this window.