SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS
6 references·16 citing·40 second hop
HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRA…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…Critical-path planning and scheduling (1959)Critical-path planning and sc…An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)An effective shuffled frog-le…Heuristic Procedures for Reactive Project Scheduling (2006)Heuristic Procedures for Reac…LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search (2004)LSSPER: Solving the Resource-…Solving the resource-constrained project scheduling problem by a variable neighbourhood search (2003)Solving the resource-constrai…Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling (2001)Analysis of Scheduling Scheme…A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A Competitive Heuristic Solut…Using metaheuristics in multiobjective resource constrained project scheduling (2000)Using metaheuristics in multi…A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A multicriteria heuristic met…Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems (1999)Satisfiability tests and time…Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling (1999)Computing lower bounds by des…Benchmark Instances for Project Scheduling Problems (1999)Benchmark Instances for Proje…A genetic algorithm approach to a general category project scheduling problem (1999)A genetic algorithm approach …Resource-constrained project scheduling by simulated annealing (1996)Resource-constrained project …Fuzzy priority heuristics for project scheduling (1996)Fuzzy priority heuristics for…Fuzzy project scheduling system for software development (1994)Fuzzy project scheduling syst…Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)Resource-constrained multi-pr…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (2007)Project selection, scheduling and resource allocation with time dependent returns (2007)A Neurogenetic approach for the resource-constrained project scheduling problem (2010)Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (1998)Time, cost and quality trade-off in project management: a case study (1999)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Journal of Industrial Engineering (2017)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A hierarchical approach to multi-project planning under uncertainty (2004)Multi-mode resource constrained multi-project scheduling and resource portfolio problem (2014)Activity networks: Project planning and control by network models (1977)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case (2017)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Schedule Optimization Using Genetic Algorithms (1991)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling (2001)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)A survey on the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1959Critical-path planning and scheduling623 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited

Cited by

  • 1999A genetic algorithm approach to a general category project scheduling problem187 cited
  • 1996Resource-constrained project scheduling by simulated annealing174 cited
  • 2001A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling168 cited
  • 2000A multicriteria heuristic method to improve resource allocation in multiproject scheduling166 cited
  • 1996Fuzzy priority heuristics for project scheduling151 cited
  • 2011An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem149 cited
  • 2001Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling144 cited
  • 1994Fuzzy project scheduling system for software development

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

144 cited
  • 2003Solving the resource-constrained project scheduling problem by a variable neighbourhood search141 cited
  • 1999Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems134 cited
  • 1999Benchmark Instances for Project Scheduling Problems132 cited
  • 1999Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling132 cited
  • 2004LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search132 cited
  • 2000Using metaheuristics in multiobjective resource constrained project scheduling129 cited
  • 1993Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics126 cited
  • 2006Heuristic Procedures for Reactive Project Scheduling123 cited