SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Liquidated Damages and Extensions of Time
0 references·2 citing·6 second hop
Liquidated Damages and Extensions of Time (2008)Liquidated Damages and Extensions of TimeContracting in a Global World: Application of the “Time at Large” Principle (2015)Contracting in a Global World…Assessment and enforcement of liquidated damages in construction contracts in Ghana (2007)Assessment and enforcement of…Construction Contracts: Law and Management (1990)Delay and Disruption in Construction Contracts (1997)The FIDIC Forms of Contract (2005)Causes of Delay in Large Building Construction Projects (1995)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2007Assessment and enforcement of liquidated damages in construction contracts in Ghana25 cited
  • 2015Contracting in a Global World: Application of the “Time at Large” Principle9 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work