SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Resource-constrained multi-project management, a hierarchical decision support system
5 references·3 citing·34 second hop
Resource-constrained multi-project management, a hierarchical decision support system (1998)Resource-constrained multi-project manage…Local search techniques for the generalized resource constrained project scheduling problem (1993)Local search techniques for t…Competitive Strategy: Techniques for Analyzing Industries and Competitors (1980)Competitive Strategy: Techniq…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach (1976)Scheduling a Project Under Mu…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …GRASP and path relinking for project scheduling under partially renewable resources (2007)GRASP and path relinking for …Dynamic order acceptance and capacity planning on a single bottleneck resource (2007)Dynamic order acceptance and …A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. (2001)A note on the paper “Resource…Activity networks: Project planning and control by network models (1977)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (2007)Planning and design models for construction industry: A critical survey (2011)An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Project Scheduling: A Research Handbook (2002)A decision support approach for assigning reviewers to proposals (2010)Project scheduling under partially renewable resources and resource consumption during setup operations (2015)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Scheduling of project networks (1985)A new heuristic solution method in resource-constrained project scheduling (1991)Scheduling a project to maximize its net present value: An integer programming approach (1993)Investment under Uncertainty (1994)Investment Under Uncertainty. (1994)Project management : a systems approach to planning, scheduling, and controlling (1995)Revenue management for operations with urgent orders (2014)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Scheduling and constraint propagation (2002)Journal of Industrial Engineering (2017)Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities (2017)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)The cornerstones of competitive advantage: A resource‐based view (1993)Varieties of Capitalism (2001)Explicating dynamic capabilities: the nature and microfoundations of (sustainable) enterprise performance (2007)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)
this work references cited by second hop

References

  • 1980Competitive Strategy: Techniques for Analyzing Industries and Competitors16,592 cited
  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1976Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach88 cited
  • 1993Local search techniques for the generalized resource constrained project scheduling problem67 cited

Cited by

  • 2007GRASP and path relinking for project scheduling under partially renewable resources50 cited
  • 2001A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.49 cited
  • 2007Dynamic order acceptance and capacity planning on a single bottleneck resource44 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work