SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration
11 references·3 citing·38 second hop
Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration (2016)Mixed-Integer Linear Programming Approach…Automated trade‐off between time and cost in planning repetitive construction projects (2009)Automated trade‐off between t…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Genetic algorithm-based multi…Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Multiobjective Linear Program…Distributed Scheduling Model for Infrastructure Networks (2004)Distributed Scheduling Model …Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Algorithm for Determining Controlling Path Considering Resource Continuity (2001)Algorithm for Determining Con…Dynamic Programming Approach to Scheduling of Nonserial Linear Project (1996)Dynamic Programming Approach …Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Critical path methods in construction practice (1970)Critical path methods in cons…Time-cost optimization in repetitive project scheduling with limited resources (2021)Time-cost optimization in rep…Resilient Scheduling as a Response to Uncertainty in Construction Projects (2021)Resilient Scheduling as a Res…Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects (2019)Resource-Constrained Time-Cos…Line‐of‐Balance Scheduling in Pavement Construction (1986)Multi-objective optimization model for multi-project scheduling on critical chain (2013)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation (2018)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling Projects with Repeating Activities (1998)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)GA optimization model for repetitive projects with soft logic (2011)Metaheuristics for project and construction management – A state-of-the-art review (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Minimizing duration and crew work interruptions of repetitive construction projects (2018)A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Work Continuity Constraints in Project Scheduling (2005)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Linear Scheduling Method for Highway Construction (1981)Scheduling system for repetitive unit construction using line-of-balance technology (2001)Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects (2008)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction (2014)MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm (2016)Construction Resource Scheduling with Genetic Algorithms (1996)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Packing Method for Resource Leveling (Pack) (1990)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa (2011)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)
this work references cited by second hop

References

  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 1970Critical path methods in construction practice145 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2007Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects108 cited
  • 2008Genetic algorithm-based multi-objective model for scheduling of linear construction projects78 cited
  • 2004Distributed Scheduling Model for Infrastructure Networks63 cited
  • 2009Automated trade‐off between time and cost in planning repetitive construction projects52 cited
  • 1996Dynamic Programming Approach to Scheduling of Nonserial Linear Project47 cited
  • 2001Algorithm for Determining Controlling Path Considering Resource Continuity37 cited

Cited by

  • 2019Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects32 cited
  • 2021Time-cost optimization in repetitive project scheduling with limited resources32 cited
  • 2021Resilient Scheduling as a Response to Uncertainty in Construction Projects27 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work