Factors contributing to poor performance in construction projects: studies of Saudi Arabia
16 references·1 citing·31 second hop
Factors contributing to poor performance in construction projects: studies of Saudi Arabia (2016)Factors contributing to poor performance …Contractors perspective toward factors affecting labor productivity in building construction (2013)Contractors perspective towar…Factors affecting contractor's business failure: contractors' perspective (2012)Factors affecting contractor'…Causes of Delay in Road Construction Projects (2011)Causes of Delay in Road Const…FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)FACTORS AFFECTING THE PERFORM…Factors Influencing Time and Cost Overruns on Construction Projects in the Gaza Strip (2008)Factors Influencing Time and …Factors constraining successful building project implementation in South Africa (2007)Factors constraining successf…Significant factors causing delay in the UAE construction industry (2006)Significant factors causing d…Causes of delay in large construction projects (2006)Causes of delay in large cons…Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Delays and cost increases in the construction of private residential projects in Kuwait (2005)Delays and cost increases in …Large construction projects in developing countries: a case study from Vietnam (2004)Large construction projects i…Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Business failures in the construction industry (2000)Business failures in the cons…Delay in public utility projects in Saudi Arabia (1999)Delay in public utility proje…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors influencing construct…Significant and top ranked delay factors in Arabic Gulf countries (2018)Significant and top ranked de…Causes of construction delay: traditional contracts (2002)Causes and effects of delays in Malaysian construction industry (2007)The top 10 universal delay factors in construction projects (2018)Causes of delays on construction projects: a comprehensive list (2019)Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model (2020)The essentials of factor analysis (1970)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Critical Success Factors for Different Project Objectives (1999)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Introduction to Factor Analysis: What It Is and How to Do It. (1980)Modelling global risk factors affecting construction cost performance (2003)Analysis of factors influencing project cost estimating practice (2000)Problems causing delays in major construction projects in Thailand (2008)What Are the Causes and Cures of Poor Megaproject Performance? A Systematic Literature Review and Research Agenda (2020)Construction delay: a quantitative analysis (2000)Delays in construction projects: The case of Jordan (2007)Journal of Construction Engineering and Management (1983)Causes of Delay in Large Building Construction Projects (1995)The effects of construction delays on project delivery in Nigerian construction industry (2002)Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)How common and how large are cost overruns in transport infrastructure projects? (2003)Megaprojects and Risk (2003)Directions for future research in project management: The main findings of a UK government-funded research network (2006)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Analysing factors affecting delays in Indian construction projects (2011)The effect of relationship management on project performance in construction (2011)CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY (2012)Determining Critical Success Factors of Project Management Practice: A Conceptual Framework (2014)Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects (2018)
this work references cited by second hop

References

  • 2006Causes of delay in large construction projects1,721 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,446 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 1997Factors influencing construction time and cost overruns on high-rise projects in Indonesia699 cited
  • 2006Significant factors causing delay in the UAE construction industry552 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited
  • 2005Delays and cost increases in the construction of private residential projects in Kuwait457 cited
  • 2009FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP424 cited
  • 2004Large construction projects in developing countries: a case study from Vietnam364 cited
  • 2011Causes of Delay in Road Construction Projects265 cited
  • 2000Business failures in the construction industry147 cited
  • 1999Delay in public utility projects in Saudi Arabia118 cited
  • 2013Contractors perspective toward factors affecting labor productivity in building construction117 cited
  • 2012Factors affecting contractor's business failure: contractors' perspective106 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2007
Factors constraining successful building project implementation in South Africa
61 cited
  • 2008Factors Influencing Time and Cost Overruns on Construction Projects in the Gaza Strip48 cited
  • Cited by

    • 2018Significant and top ranked delay factors in Arabic Gulf countries42 cited