SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Setup Time Reduction in an Automotive Battery Assembly Line
0 references·3 citing·12 second hop
Setup Time Reduction in an Automotive Battery Assembly Line (2013)Setup Time Reduction in an Automotive Bat…A Case Study on Reducing Setup Time Using SMED on a Turning Line (2021)A Case Study on Reducing Setu…SMED for quick changeover in manufacturing industry – a case study (2018)SMED for quick changeover in …A novel integrated SMED approach for reducing setup time (2017)A novel integrated SMED appro…Introduction to Grey system theory (1989)Quality Engineering Using Robust Design (1990)Quality Engineering Using Robust Design (1991)A Model to Reduce Machine Changeover Time and Improve Production Efficiency in an Automotive Manufacturing Organisation (2023)Modern Approaches to Manufacturing Improvement : The Shingo System (1990)SMED: for quick changeovers in foundry SMEs (2009)Single Minute Exchange of Die: A Case Study Implementation (2011)Centerline-SMED integration for machine changeovers improvement in food industry (2019)The 4Rs supply chain resilience framework: A capability perspective (2022)Setup Time Reduction for Electronics Assembly: Combining Simple (SMED) and IT‐Based Methods (2005)Process improvement: performance analysis of the setup time reduction-SMED in the automobile industry (2008)A Revolution in Manufacturing: The SMED System (2019)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2018SMED for quick changeover in manufacturing industry – a case study40 cited
  • 2017A novel integrated SMED approach for reducing setup time31 cited
  • 2021A Case Study on Reducing Setup Time Using SMED on a Turning Line25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work