Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
16 references·0 citing·43 second hop
Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects (2017)Logistic regression analysis for factors …Exploratory Factor Analysis: A Five-Step Guide for Novices (2010)Exploratory Factor Analysis: …Exploratory Factor Analysis With Small Sample Sizes (2009)Exploratory Factor Analysis W…Cost escalation and schedule delays in road construction projects in Zambia (2008)Cost escalation and schedule …Framing of project critical success factors by a systems model (2005)Framing of project critical s…Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Factors Affecting the Success of a Construction Project (2004)Factors Affecting the Success…Modelling global risk factors affecting construction cost performance (2003)Modelling global risk factors…How common and how large are cost overruns in transport infrastructure projects? (2003)How common and how large are …Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Sample size in factor analysis. (1999)Sample size in factor analysi…Is More Ever Too Much? The Number of Indicators per Factor in Confirmatory Factor Analysis (1998)Is More Ever Too Much? The Nu…Comparison of U.S. Project Delivery Systems (1998)Comparison of U.S. Project De…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors influencing construct…Causes of delay and cost overruns in Nigerian construction projects (1994)Causes of delay and cost over…The scientific use of factor analysis: Raymond B. Cattell Plenum Press, £20.48 (1981)The scientific use of factor …Evaluating the use of exploratory factor analysis in psychological research. (1999)Current Methodological Considerations in Exploratory and Confirmatory Factor Analysis (2011)On exploratory factor analysis: A review of recent evidence, an assessment of current practice, and recommendations for future use (2013)An empirical Kaiser criterion. (2016)Best practices in exploratory factor analysis: four recommendations for getting the most from your analysis (2020)Introduction to Factor Analysis: What It Is and How to Do It. (1980)Significant factors causing delay in the UAE construction industry (2006)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Systems Thinking, Systems Practice (1981)Systems thinking, systems practice (1982)Success Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework (2008)Do project managers practice what they preach, and does it matter to project success? (2009)Exploring the value of project management: Linking Project Management Performance and Project Success (2013)Learning From Experience (2023)Globalization: The Human Consequences (1998)Rationality and Power: Democracy in Practice. (1999)Megaprojects and Risk (2003)What Causes Cost Overrun in Transport Infrastructure Projects? (2004)How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation (2005)The Application of Electronic Computers to Factor Analysis (1960)The Scree Test For The Number Of Factors (1966)El análisis factorial exploratorio de los ítems: una guía práctica, revisada y actualizada (2014)Applied Psychometrics: Sample Size and Sample Power Considerations in Factor Analysis (EFA, CFA) and SEM in General (2018)Digital transforming capability and performance: a microfoundational perspective (2020)Alternative Ways of Assessing Model Fit (1992)Power analysis and determination of sample size for covariance structure modeling. (1996)To Parcel or Not to Parcel: Exploring the Question, Weighing the Merits (2002)Best Practices for Developing and Validating Scales for Health, Social, and Behavioral Research: A Primer (2018)A new framework for determining critical success/failure factors in projects (1996)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects (2009)Determining Critical Success Factors of Project Management Practice: A Conceptual Framework (2014)Investigating the relationship between communication-conflict interaction and project success among construction project teams (2017)Significance tests and goodness of fit in the analysis of covariance structures. (1980)Structural Equations with Latent Variables (1989)Structural Equations with Latent Variables. (1991)Revisiting Sample Size and Number of Parameter Estimates: Some Support for the N:q Hypothesis (2003)Searching for the structure of coping: A review and critique of category systems for classifying ways of coping. (2003)Model fit and model selection in structural equation modeling. (2012)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)Directions for future research in project management: The main findings of a UK government-funded research network (2006)Should we build more large dams? The actual costs of hydropower megaproject development (2014)
this work references cited by second hop

References

  • 1999Sample size in factor analysis.5,487 cited
  • 2010Exploratory Factor Analysis: A Five-Step Guide for Novices2,752 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,446 cited
  • 1998Is More Ever Too Much? The Number of Indicators per Factor in Confirmatory Factor Analysis1,307 cited
  • 2009Exploratory Factor Analysis With Small Sample Sizes1,176 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 2003How common and how large are cost overruns in transport infrastructure projects?786 cited
  • 2004Factors Affecting the Success of a Construction Project772 cited
  • 1997Factors influencing construction time and cost overruns on high-rise projects in Indonesia699 cited
  • 2005Framing of project critical success factors by a systems model616 cited
  • 2008Cost escalation and schedule delays in road construction projects in Zambia599 cited
  • 2003Modelling global risk factors affecting construction cost performance588 cited
  • 1981The scientific use of factor analysis: Raymond B. Cattell Plenum Press, £20.48552 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

1998
Comparison of U.S. Project Delivery Systems
484 cited
  • 1994Causes of delay and cost overruns in Nigerian construction projects457 cited
  • Cited by

    No citing works inside the corpus for this window.