No open-access location is known for this record yet.
No open-access location is known for this record yet.
This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
Loading…
Stored only when both papers are in the corpus — 24 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.