SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimization of the annual construction program solutions
6 references·0 citing·27 second hop
Optimization of the annual construction program solutions (2017)Optimization of the annual construction p…Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Optimizing Multiple-Resources…Two-Stage Scheduling Model for Resource Leveling of Linear Projects (2014)Two-Stage Scheduling Model fo…Construction Project Scheduling and Control (2010)Construction Project Scheduli…Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Solving the Multi-Mode Resour…A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A new efficient simulated ann…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Packing Method for Resource Leveling (Pack) (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Time–cost–quality trade-off analysis for planning construction projects (2019)Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling (2020)Scheduling Projects with Repeating Activities (1998)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)Survey of quantitative methods in construction (2017)Resource Leveling Based on Line of Balance and Constraint Programming (2018)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Risk management implementation in small and medium enterprises in the UK construction industry (2015)Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction (2021)
this work references cited by second hop

References

  • 2003A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version511 cited
  • 2003Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms251 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 2010Construction Project Scheduling and Control133 cited
  • 2015Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search116 cited
  • 2014Two-Stage Scheduling Model for Resource Leveling of Linear Projects44 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work