Project scheduling for constructing biogas plant using critical path method
2 references·5 citing·25 second hop
Project scheduling for constructing biogas plant using critical path method (2017)Project scheduling for constructing bioga…Simplified CPM/PERT Simulation Model (2000)Simplified CPM/PERT Simulatio…A Guide to the project management body of knowledge (1996)A Guide to the project manage…Using the critical path method (CPM) for evaluating allocation potential of temporary housing units (2025)Using the critical path metho…Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm (2023)Bi-objective multi-mode resou…A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty (2022)A Bayesian-Driven Monte Carlo…A group TOPSIS-COPRAS methodology with Pythagorean fuzzy sets considering weights of experts for project critical path problem (2019)A group TOPSIS-COPRAS methodo…Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT) (2018)Using fuzzy logic to improve …Project Management: Techniques in Planning and Controlling Construction Projects (1984)Planning and analysis of construction operations (1992)Tools for Thinking—Modelling in Management Science (1997)Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Constructability: Outline of Past, Present, and Future Research (2017)From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time (1995)Applying fuzzy method for measuring criticality in project network (2007)Resource-constrained project scheduling problem: review of past and recent developments (2018)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)Multiple Attribute Decision Making (1981)Pythagorean Membership Grades in Multicriteria Decision Making (2013)Extension of TOPSIS to Multiple Criteria Decision Making with Pythagorean Fuzzy Sets (2014)Application of a Technique for Research and Development Program Evaluation (1959)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Differential evolution for solving multi-mode resource-constrained project scheduling problems (2008)Multi-mode resource constrained multi-project scheduling and resource portfolio problem (2014)Critical-path planning and scheduling (1959)Issues in managing disaster relief inventories (2007)Resilience thinking in health protection (2011)The Logical Framework Method for Defining Project Success (1999)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)Leadership competency profiles of successful project managers (2009)
this work references cited by second hop

References

  • 1996A Guide to the project management body of knowledge4,339 cited
  • 2000Simplified CPM/PERT Simulation Model103 cited

Cited by

  • 2018Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT)57 cited
  • 2023Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm47 cited
  • 2022A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty43 cited
  • 2019A group TOPSIS-COPRAS methodology with Pythagorean fuzzy sets considering weights of experts for project critical path problem37 cited
  • 2025Using the critical path method (CPM) for evaluating allocation potential of temporary housing units6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work